Information based on query as of Thursday, October 31, 2024.
Permit Information
Permit NumberELE17-01549
StatusFinaled
Name DOHERTY ELECTRIC
Site Address 150 N CAPITOL BLVD
Project Name 
Customer NumberPlaza Reno
ePlanReviewNo
Description
Alteration: Provide new lighting and electrical for new outside fountain.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final3/29/20193/29/20193/29/2019PPASS
DetailsRock A. Hudson
Electrical final
Shane McKissen is the contact Phone #: ###-#### Inspection requested via web by Shawna Gates Final ok
Final6/28/20186/28/20186/28/2018PFAIL
DetailsRock A. Hudson
Please call Shane prior to inspection so he can meet you onsite. Phone #: ###-#### Inspection requested via web by Shawna Gates
Corrections not completed. Must recall when complete.
Final6/25/20186/26/20186/26/2018PFAIL
DetailsRock A. Hudson
Please call Shane 30 min prior so he can meet you onsite.
Shane''s cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates
Circuit directory for fountain control panel.
Fountain control panel transformer shall bond neutral at trans to grounding electrode a system.
Remove flexible cord and replace with structural wiring method.
Electrical Rough-In3/13/20183/13/20183/13/2018PPASS
DetailsRock A. Hudson
UNDERGROUND SHANE IS THE CONTACT HIS CELL NO. IS ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates
Location west of city hall for fiber optic conduits. Inspection not required for communication conduits.
Electrical Rough-In1/10/20181/10/20181/10/2018PPASS
DetailsRock A. Hudson
Underground Main Street. Phone #: ###-#### Inspection requested via web by Shawna Gates
Main street side, east of parking garage entrance 4" for fiber underground rough in ok cover.
Electrical Rough-In1/8/20181/8/20181/8/2018PPASS
DetailsJames Ady
Shane is the contact his cell no is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates Need to meet onsite and go over low volt wiring. Fountain control area only line volt only. rough in only.
Electrical Rough-In12/6/201712/7/201712/7/2017ANR
DetailsRock A. Hudson
Underground. Main Street. Shane is the contact his cell is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates
Called contact and he stated conduit not installed yet will recall when ready.
Electrical Rough-In12/5/201712/6/201712/6/2017APASS
DetailsRock A. Hudson
Shane is the contact his cell no.is ###-####.Historic pole lights on Main Street. Phone #: ###-#### Inspection requested via web by Shawna Gates
Request will need public works approval. Underground and pole bases for south west of parking garage entrance rough in ok cover.
Final11/30/201712/1/201711/30/2017ACANC
DetailsRock A. Hudson
Chris is the contact ###-#### Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
Electrical Rough-In11/22/201711/22/201711/22/2017PPASS
DetailsJames Ady
Underground Fiber optics on Main Street Shane is the contact his cell no is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates underground only fiber and 2in to light vault
Electrical Rough-In11/9/201711/13/201711/13/2017APASS
DetailsRock A. Hudson
Fiber optics. Main st. Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates
Area noted from capitol to ramp on main rough in ok cover
Electrical Rough-In11/2/201711/3/201711/3/2017APASS
DetailsRock A. Hudson
Linear lights 9am pour. Shane is contact his cell is ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates
Last linear light pour south end rough in ok cover
Electrical Rough-In10/30/201710/31/201710/31/2017APASS
DetailsRock A. Hudson
9am pour. Linear lights. Shane is the contact his cell no is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates
2 band lights and 1 at top of south stair remain to pour. South sculpture light pour rough in ok cover
Electrical Rough-In10/25/201710/26/201710/26/2017APASS
DetailsRock A. Hudson
10 AM POUR. LINEAR LIGHTS. SHANE IS THE CONTACT HIS
CELL NO. IS ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates
3 lights included in this southwest pour. Rough in ok cover
Electrical Rough-In10/24/201710/25/201710/25/2017ACANC
DetailsRock A. Hudson
9 am pour. Linear lights. Shane is the contact his cell no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
Electrical Rough-In10/23/201710/24/201710/24/2017APASS
DetailsDaryl DeGrange
Linear lights. 9am pour. Shane is the contact his cell is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates Roug-in ok pour southside plaza and linear lights
Conference10/19/201710/19/201710/19/2017PCANC
DetailsRock A. Hudson
Vestibule - Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates
Needed rough in inspection
Electrical Rough-In10/19/201710/19/201710/19/2017PPASS
DetailsRock A. Hudson
Vestibule - Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates
1 MC hanging waiting for door. Vestibule grid rough in ok cover
Electrical Rough-In10/18/201710/18/201710/18/2017PPASS
DetailsRock A. Hudson
10 am pour. Linear lights south plaza.
Shane ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates
Discussed replacement of sub gear and the use of gutter beneath. 1 set of parallel conductors less than 20% fill. Use of gutter OK. Rough in of same lights inspected 10-17 OK
Electrical Rough-In10/16/201710/17/201710/17/2017APASS
DetailsRock A. Hudson
Linear lights. Shane is the contact his cell is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates
South end of plaza rough in ok cover
Electrical Rough-In10/5/201710/6/201710/6/2017APASS
DetailsEric Story
Shane is the contact: ###-####
North Plaza
Underground Phone #: ###-#### Inspection requested via web by Shawna Gates
West end planters on Capitol BLVD for tree outlets and lights ok to cover
Electrical Rough-In9/29/201710/2/201710/2/2017APASS
DetailsRock A. Hudson
9am pour - Line voltage conduit
Shane is the contact his cell ###-####. Inspection requested via web by Shawna Gates
Pour near idaho st stair 2- 1/2" conduits rough in ok cover
Electrical Rough-In9/26/20179/27/20179/27/2017APASS
DetailsEric Story
Shane is the contact: ###-####
NW Plaza LV lighting
Tape lighting and linear lighting. Phone #: ###-#### Inspection requested via web by Shawna Gates
Middle vestible black lights embedded in concrete ok to cover
Electrical Rough-In9/26/20179/27/20179/26/2017PCANC
DetailsRock A. Hudson
NW plaza LV lighting. Shane is the contact ###-####. >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
Electrical Rough-In9/14/20179/15/20179/15/2017APASS
DetailsRock A. Hudson
9 am pour. Inspection on Linear lights and we need inspection on Vestibule.
Shane is the contact his cell is 208.###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates
2 center linear lights and vestibule wall rough in ok cover
Electrical Rough-In9/14/20179/15/20179/14/2017ACANC
DetailsRock A. Hudson
The Contact is Shane: ###-####
Vestibule Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
Electrical Rough-In9/8/20179/11/20179/11/2017APASS
DetailsRock A. Hudson
Linear lights. Area in front of vestibule. Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates
Area noted 2 lights in front of vestibule rough in ok cover
Electrical Rough-In9/6/20179/7/20179/7/2017APASS
DetailsRock A. Hudson
Linear lights. 9am pour. Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates
Additional 2 on edge of band south 1/2 rough in ok cover
Electrical Rough-In9/5/20179/6/20179/6/2017APASS
DetailsRock A. Hudson
Linear lights. They are pouring at 9am.
Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates
South 1/2 linear lights rough in ok cover
Rough-In Permanent Service9/1/20179/5/20179/5/2017PPASS
DetailsRock A. Hudson
Linear lights. Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates
Linear lights are the in walkway to main entrance, concrete up lights in decorative bands. South 1/2 rough in ok cover
Electrical Rough-In9/1/20179/5/20179/5/2017ACANC
DetailsRock A. Hudson
Linear lights plaza. Shane is the contact his cell no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
Electrical Rough-In8/31/20179/1/20179/1/2017PCANC
DetailsDaryl DeGrange
The contact is Shane.
(208) 697- 1925 Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
Electrical Rough-In8/29/20178/31/20178/31/2017PPASS
DetailsDaryl DeGrange
Shane is the contact
###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates Rough-in ok cover 3 step walls with low voltage lighting
Electrical Rough-In8/25/20178/28/20178/28/2017PPASS
DetailsDaryl DeGrange
Shane is contact his cell ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates. Three UL Listed luminares in concrete ramp wall near Grid "E"
Electrical Rough-In8/25/20178/28/20178/25/2017ACANC
DetailsRock A. Hudson
Shane is contact his cell is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
Electrical Rough-In8/22/20178/23/20178/23/2017PPASS
DetailsRock A. Hudson
Shane is the contact his cell no. is 208.697.1925 Phone #: ###-#### Inspection requested via web by Shawna Gates
1 of many South band light pour rough in ok cover
Electrical Rough-In8/21/20178/22/20178/22/2017APASS
DetailsRock A. Hudson
Pouring at 7:30am - Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates
Contractor sent pics of install, informed an in person inspection required for future pours to check all listings and installations. Told to inform General ample time shall be given to complete. Off pics provided rough in ok cover
Conference8/17/20178/18/20178/18/2017ACANC
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Shawna Gates
Needed orugh in inspection
Electrical Rough-In8/18/20178/18/20178/18/2017PPASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Shawna Gates
Underground and bases for ballards and step light to south of entrance rough in ok cover
Electrical Rough-In8/17/20178/18/20178/17/2017ACANC
DetailsRock A. Hudson
Shane is the contact his cell no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
Electrical Rough-In8/17/20178/17/20178/17/2017PPASS
DetailsRock A. Hudson
Shane is the contact his cell on is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates
Low volt lighting flex for LED ribbon rough in ok cover
Electrical Rough-In8/15/20178/16/20178/16/2017APASS
DetailsRock A. Hudson
Shane is the contact. His cell number is ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates
North of vestibule bollard and tree outlets conduits rough in ok cover.
Electrical Rough-In8/14/20178/15/20178/14/2017APASS
DetailsRock A. Hudson
Underground Phone #: ###-#### Inspection requested via web by Shawna Gates
Underground front south of entrance rough in ok cover
Electrical Rough-In8/4/20178/7/20178/7/2017APASS
DetailsRock A. Hudson
SHANE IS THE CONTACT HIS CELL NO IS ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates
Raceways for low volt tape lighting in sea walls rough in ok cover.
Electrical Rough-In7/24/20177/25/20177/25/2017PPASS
DetailsRock A. Hudson
Underground for fiber optic lines. Shane is the contact his cell is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates
Capitol north 1/2 for street lights, Idaho st fiber underground rough in ok cover noted in office
Electrical Rough-In6/29/20176/30/20176/30/2017APASS
DetailsRock A. Hudson
Shane is the contact
cell #: ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates
General contractor asked all electrical inspections be noted on clip board in job trailer on east side.
Southern most flag pole rough in ok cover
Conference6/8/20176/12/20176/12/2017ADONE
DetailsRock A. Hudson
BASEMENT. SHANE IS THE CONTACT HIS CELL IS ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates
Discussed location for panel and transformer feeding equipment for plaza fountain. Minimum dedicated electrical space shall be provided. Fiber optic conduits and plumbing pipe shall either rout around electrical gear or gear shall move to allow conduits to run behind gear.
Issue PAID IN FULL permit  5/22/2017 DONE
Payment received via Govolutions
Application received  5/22/2017 DONE
This permit was created on the web by Shawna Gates
First Notice3/29/20193/29/2019   
DetailsRock A. Hudson