Final | 3/29/2019 | 3/29/2019 | 3/29/2019 | P | PASS |
Rock A. Hudson
|
|
|
Electrical final Shane McKissen is the contact Phone #: ###-#### Inspection requested via web by Shawna Gates Final ok
|
Final | 6/28/2018 | 6/28/2018 | 6/28/2018 | P | FAIL |
Rock A. Hudson
|
|
|
Please call Shane prior to inspection so he can meet you onsite. Phone #: ###-#### Inspection requested via web by Shawna Gates Corrections not completed. Must recall when complete.
|
Final | 6/25/2018 | 6/26/2018 | 6/26/2018 | P | FAIL |
Rock A. Hudson
|
|
|
Please call Shane 30 min prior so he can meet you onsite. Shane''s cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates Circuit directory for fountain control panel. Fountain control panel transformer shall bond neutral at trans to grounding electrode a system. Remove flexible cord and replace with structural wiring method.
|
Electrical Rough-In | 3/13/2018 | 3/13/2018 | 3/13/2018 | P | PASS |
Rock A. Hudson
|
|
|
UNDERGROUND SHANE IS THE CONTACT HIS CELL NO. IS ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates Location west of city hall for fiber optic conduits. Inspection not required for communication conduits.
|
Electrical Rough-In | 1/10/2018 | 1/10/2018 | 1/10/2018 | P | PASS |
Rock A. Hudson
|
|
|
Underground Main Street. Phone #: ###-#### Inspection requested via web by Shawna Gates Main street side, east of parking garage entrance 4" for fiber underground rough in ok cover.
|
Electrical Rough-In | 1/8/2018 | 1/8/2018 | 1/8/2018 | P | PASS |
James Ady
|
|
|
Shane is the contact his cell no is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates Need to meet onsite and go over low volt wiring. Fountain control area only line volt only. rough in only.
|
Electrical Rough-In | 12/6/2017 | 12/7/2017 | 12/7/2017 | A | NR |
Rock A. Hudson
|
|
|
Underground. Main Street. Shane is the contact his cell is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates Called contact and he stated conduit not installed yet will recall when ready.
|
Electrical Rough-In | 12/5/2017 | 12/6/2017 | 12/6/2017 | A | PASS |
Rock A. Hudson
|
|
|
Shane is the contact his cell no.is ###-####.Historic pole lights on Main Street. Phone #: ###-#### Inspection requested via web by Shawna Gates Request will need public works approval. Underground and pole bases for south west of parking garage entrance rough in ok cover.
|
Final | 11/30/2017 | 12/1/2017 | 11/30/2017 | A | CANC |
Rock A. Hudson
|
|
|
Chris is the contact ###-#### Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|
Electrical Rough-In | 11/22/2017 | 11/22/2017 | 11/22/2017 | P | PASS |
James Ady
|
|
|
Underground Fiber optics on Main Street Shane is the contact his cell no is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates underground only fiber and 2in to light vault
|
Electrical Rough-In | 11/9/2017 | 11/13/2017 | 11/13/2017 | A | PASS |
Rock A. Hudson
|
|
|
Fiber optics. Main st. Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates Area noted from capitol to ramp on main rough in ok cover
|
Electrical Rough-In | 11/2/2017 | 11/3/2017 | 11/3/2017 | A | PASS |
Rock A. Hudson
|
|
|
Linear lights 9am pour. Shane is contact his cell is ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates Last linear light pour south end rough in ok cover
|
Electrical Rough-In | 10/30/2017 | 10/31/2017 | 10/31/2017 | A | PASS |
Rock A. Hudson
|
|
|
9am pour. Linear lights. Shane is the contact his cell no is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates 2 band lights and 1 at top of south stair remain to pour. South sculpture light pour rough in ok cover
|
Electrical Rough-In | 10/25/2017 | 10/26/2017 | 10/26/2017 | A | PASS |
Rock A. Hudson
|
|
|
10 AM POUR. LINEAR LIGHTS. SHANE IS THE CONTACT HIS CELL NO. IS ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates 3 lights included in this southwest pour. Rough in ok cover
|
Electrical Rough-In | 10/24/2017 | 10/25/2017 | 10/25/2017 | A | CANC |
Rock A. Hudson
|
|
|
9 am pour. Linear lights. Shane is the contact his cell no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|
Electrical Rough-In | 10/23/2017 | 10/24/2017 | 10/24/2017 | A | PASS |
Daryl DeGrange
|
|
|
Linear lights. 9am pour. Shane is the contact his cell is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates Roug-in ok pour southside plaza and linear lights
|
Conference | 10/19/2017 | 10/19/2017 | 10/19/2017 | P | CANC |
Rock A. Hudson
|
|
|
Vestibule - Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates Needed rough in inspection
|
Electrical Rough-In | 10/19/2017 | 10/19/2017 | 10/19/2017 | P | PASS |
Rock A. Hudson
|
|
|
Vestibule - Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates 1 MC hanging waiting for door. Vestibule grid rough in ok cover
|
Electrical Rough-In | 10/18/2017 | 10/18/2017 | 10/18/2017 | P | PASS |
Rock A. Hudson
|
|
|
10 am pour. Linear lights south plaza. Shane ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates Discussed replacement of sub gear and the use of gutter beneath. 1 set of parallel conductors less than 20% fill. Use of gutter OK. Rough in of same lights inspected 10-17 OK
|
Electrical Rough-In | 10/16/2017 | 10/17/2017 | 10/17/2017 | A | PASS |
Rock A. Hudson
|
|
|
Linear lights. Shane is the contact his cell is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates South end of plaza rough in ok cover
|
Electrical Rough-In | 10/5/2017 | 10/6/2017 | 10/6/2017 | A | PASS |
Eric Story
|
|
|
Shane is the contact: ###-#### North Plaza Underground Phone #: ###-#### Inspection requested via web by Shawna Gates West end planters on Capitol BLVD for tree outlets and lights ok to cover
|
Electrical Rough-In | 9/29/2017 | 10/2/2017 | 10/2/2017 | A | PASS |
Rock A. Hudson
|
|
|
9am pour - Line voltage conduit Shane is the contact his cell ###-####. Inspection requested via web by Shawna Gates Pour near idaho st stair 2- 1/2" conduits rough in ok cover
|
Electrical Rough-In | 9/26/2017 | 9/27/2017 | 9/27/2017 | A | PASS |
Eric Story
|
|
|
Shane is the contact: ###-#### NW Plaza LV lighting Tape lighting and linear lighting. Phone #: ###-#### Inspection requested via web by Shawna Gates Middle vestible black lights embedded in concrete ok to cover
|
Electrical Rough-In | 9/26/2017 | 9/27/2017 | 9/26/2017 | P | CANC |
Rock A. Hudson
|
|
|
NW plaza LV lighting. Shane is the contact ###-####. >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|
Electrical Rough-In | 9/14/2017 | 9/15/2017 | 9/15/2017 | A | PASS |
Rock A. Hudson
|
|
|
9 am pour. Inspection on Linear lights and we need inspection on Vestibule. Shane is the contact his cell is 208.###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates 2 center linear lights and vestibule wall rough in ok cover
|
Electrical Rough-In | 9/14/2017 | 9/15/2017 | 9/14/2017 | A | CANC |
Rock A. Hudson
|
|
|
The Contact is Shane: ###-#### Vestibule Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|
Electrical Rough-In | 9/8/2017 | 9/11/2017 | 9/11/2017 | A | PASS |
Rock A. Hudson
|
|
|
Linear lights. Area in front of vestibule. Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates Area noted 2 lights in front of vestibule rough in ok cover
|
Electrical Rough-In | 9/6/2017 | 9/7/2017 | 9/7/2017 | A | PASS |
Rock A. Hudson
|
|
|
Linear lights. 9am pour. Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates Additional 2 on edge of band south 1/2 rough in ok cover
|
Electrical Rough-In | 9/5/2017 | 9/6/2017 | 9/6/2017 | A | PASS |
Rock A. Hudson
|
|
|
Linear lights. They are pouring at 9am. Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates South 1/2 linear lights rough in ok cover
|
Rough-In Permanent Service | 9/1/2017 | 9/5/2017 | 9/5/2017 | P | PASS |
Rock A. Hudson
|
|
|
Linear lights. Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates Linear lights are the in walkway to main entrance, concrete up lights in decorative bands. South 1/2 rough in ok cover
|
Electrical Rough-In | 9/1/2017 | 9/5/2017 | 9/5/2017 | A | CANC |
Rock A. Hudson
|
|
|
Linear lights plaza. Shane is the contact his cell no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|
Electrical Rough-In | 8/31/2017 | 9/1/2017 | 9/1/2017 | P | CANC |
Daryl DeGrange
|
|
|
The contact is Shane. (208) 697- 1925 Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|
Electrical Rough-In | 8/29/2017 | 8/31/2017 | 8/31/2017 | P | PASS |
Daryl DeGrange
|
|
|
Shane is the contact ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates Rough-in ok cover 3 step walls with low voltage lighting
|
Electrical Rough-In | 8/25/2017 | 8/28/2017 | 8/28/2017 | P | PASS |
Daryl DeGrange
|
|
|
Shane is contact his cell ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates. Three UL Listed luminares in concrete ramp wall near Grid "E"
|
Electrical Rough-In | 8/25/2017 | 8/28/2017 | 8/25/2017 | A | CANC |
Rock A. Hudson
|
|
|
Shane is contact his cell is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|
Electrical Rough-In | 8/22/2017 | 8/23/2017 | 8/23/2017 | P | PASS |
Rock A. Hudson
|
|
|
Shane is the contact his cell no. is 208.697.1925 Phone #: ###-#### Inspection requested via web by Shawna Gates 1 of many South band light pour rough in ok cover
|
Electrical Rough-In | 8/21/2017 | 8/22/2017 | 8/22/2017 | A | PASS |
Rock A. Hudson
|
|
|
Pouring at 7:30am - Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates Contractor sent pics of install, informed an in person inspection required for future pours to check all listings and installations. Told to inform General ample time shall be given to complete. Off pics provided rough in ok cover
|
Conference | 8/17/2017 | 8/18/2017 | 8/18/2017 | A | CANC |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Shawna Gates Needed orugh in inspection
|
Electrical Rough-In | 8/18/2017 | 8/18/2017 | 8/18/2017 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Shawna Gates Underground and bases for ballards and step light to south of entrance rough in ok cover
|
Electrical Rough-In | 8/17/2017 | 8/18/2017 | 8/17/2017 | A | CANC |
Rock A. Hudson
|
|
|
Shane is the contact his cell no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|
Electrical Rough-In | 8/17/2017 | 8/17/2017 | 8/17/2017 | P | PASS |
Rock A. Hudson
|
|
|
Shane is the contact his cell on is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates Low volt lighting flex for LED ribbon rough in ok cover
|
Electrical Rough-In | 8/15/2017 | 8/16/2017 | 8/16/2017 | A | PASS |
Rock A. Hudson
|
|
|
Shane is the contact. His cell number is ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates North of vestibule bollard and tree outlets conduits rough in ok cover.
|
Electrical Rough-In | 8/14/2017 | 8/15/2017 | 8/14/2017 | A | PASS |
Rock A. Hudson
|
|
|
Underground Phone #: ###-#### Inspection requested via web by Shawna Gates Underground front south of entrance rough in ok cover
|
Electrical Rough-In | 8/4/2017 | 8/7/2017 | 8/7/2017 | A | PASS |
Rock A. Hudson
|
|
|
SHANE IS THE CONTACT HIS CELL NO IS ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates Raceways for low volt tape lighting in sea walls rough in ok cover.
|
Electrical Rough-In | 7/24/2017 | 7/25/2017 | 7/25/2017 | P | PASS |
Rock A. Hudson
|
|
|
Underground for fiber optic lines. Shane is the contact his cell is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates Capitol north 1/2 for street lights, Idaho st fiber underground rough in ok cover noted in office
|
Electrical Rough-In | 6/29/2017 | 6/30/2017 | 6/30/2017 | A | PASS |
Rock A. Hudson
|
|
|
Shane is the contact cell #: ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates General contractor asked all electrical inspections be noted on clip board in job trailer on east side. Southern most flag pole rough in ok cover
|
Conference | 6/8/2017 | 6/12/2017 | 6/12/2017 | A | DONE |
Rock A. Hudson
|
|
|
BASEMENT. SHANE IS THE CONTACT HIS CELL IS ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates Discussed location for panel and transformer feeding equipment for plaza fountain. Minimum dedicated electrical space shall be provided. Fiber optic conduits and plumbing pipe shall either rout around electrical gear or gear shall move to allow conduits to run behind gear.
|
Issue PAID IN FULL permit | | | 5/22/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/22/2017 | | DONE |
|
|
|
This permit was created on the web by Shawna Gates
|
First Notice | 3/29/2019 | 3/29/2019 | | | |
Rock A. Hudson
|
|
|
|