Final | 4/17/2019 | 4/18/2019 | 4/18/2019 | A | PASS |
Rock A. Hudson
|
|
|
Beth-homeowner called inspection in Phone #: ###-#### Final ok
|
Final | 1/21/2019 | 1/23/2019 | 1/23/2019 | P | NR |
Mark Moncarr
|
|
|
The equipment is all located outsid on the right side of the garage. The GFCI breaker is located in the main electrical panel inside the garage. Phone #: ###-#### Inspection requested via web by Jonathan Poot Homeowner and electrician are going to coordinate for final later. Homeowner informed me that the pool equipt has been winterized and is off.
|
Electrical Rough-In | 8/22/2018 | 8/23/2018 | 8/23/2018 | P | PASS |
Rock A. Hudson
|
|
|
Pool Bonding Inspection Phone #: ###-#### Inspection requested via web by Jonathan Poot Non metallic pool shell. EQ bonding and to each side of cover assembly. Rough in ok cover.
|
Electrical Rough-In | 8/16/2018 | 8/16/2018 | 8/16/2018 | P | PASS |
Mark Moncarr
|
|
|
Need inspection of underground conduits and ground wire in ditch from equipment to the pool. Thank you. Phone #: ###-#### Inspection requested via web by Jonathan Poot Underground ok cover.
|
Issue PAID IN FULL permit | | | 8/14/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/14/2018 | | DONE |
|
|
|
This permit was created on the web by Jonathan Poot
|