Print Statement | | | 1/13/2020 | | DONE |
|
|
|
|
Final | 10/30/2019 | 10/31/2019 | 10/31/2019 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Jason Parke All areas have been completed Final ok
|
Electrical Rough-In | 10/11/2019 | 10/14/2019 | 10/14/2019 | A | PASS |
James Ady
|
|
|
southwest office area furniture and ok to occupy Final breakroom and bathrooms Phone #: ###-#### Inspection requested via web by Jason Parke SW office furniture ok Breakroom and bathrooms ok
|
Permanent Service | 10/8/2019 | 10/8/2019 | 10/8/2019 | P | PART |
James Ady
|
|
|
Service inspection and review areas that are complete and ready for occupancy Phone #: ###-#### Inspection requested via web by Jason Parke 110.26C3. Personnel doors. Where equipment rated 800A or more that contain overcurrent devices. Personel doors shall open in the direction of egress and be equiped with listerd panic hardware.. (Bus duct electrical room.) NE and SE area cubicals checked and ready for final.
|
Conference | 10/1/2019 | 10/1/2019 | 10/1/2019 | P | PASS |
James Ady
|
|
|
Furniture installed in northeast and east areas- ok to occupy Phone #: ###-#### Inspection requested via web by Jason Parke Talked about items needed for TCO (All life safety items need to be complete)
|
Electrical Rough-In | 9/26/2019 | 9/26/2019 | 9/26/2019 | A | PASS |
James Ady
|
|
|
Pre-final walk through of northwest and southwest cubicle and office areas Hallway and breakroom ceilings Phone #: ###-#### Inspection requested via web by Jason Parke SW and NW offices, cubicle areas, conf rooms and reception area hot checked and ready for final Hall and Elevator lobby ceiling ok to cover.
|
Electrical Rough-In | 9/26/2019 | 9/26/2019 | 9/26/2019 | A | CANC |
James Ady
|
|
|
Hallway and breakroom ceilings Phone #: ###-#### >> Inspection requested via web by Jason Parke Inspection cancelled from web by: Jason Parke
|
Electrical Rough-In | 9/16/2019 | 9/17/2019 | 9/17/2019 | A | PASS |
James Ady
|
|
|
Pre-inspection in preparation for desks and furniture. East side offices and open area Southeast side offices and open area Phone #: ###-#### Inspection requested via web by Jason Parke Areas listed have been Hot checked and are ready for furniture set up and final.
|
Electrical Rough-In | 9/10/2019 | 9/11/2019 | 9/11/2019 | A | PASS |
James Ady
|
|
|
Pre-inspection in preparation for desks and furniture Phone #: ###-#### Inspection requested via web by Jason Parke NE offices and open office areas ok to set up funiture.
|
Electrical Rough-In | 9/9/2019 | 9/10/2019 | 9/10/2019 | A | PASS |
James Ady
|
|
|
Northwest offices and open area ceilings Phone #: ###-#### Inspection requested via web by Jason Parke Areas listed ok to cover
|
Electrical Rough-In | 8/21/2019 | 8/21/2019 | 8/21/2019 | P | PASS |
Rock A. Hudson
|
|
|
Southwest cubicle area and offices ceiling inspection New wall in breakroom Please contact Tom ###-#### Phone #: ###-#### Inspection requested via web by Jason Parke Grid in area noted rough in ok cover
|
Electrical Rough-In | 8/20/2019 | 8/21/2019 | 8/21/2019 | A | PASS |
Rock A. Hudson
|
|
|
Please call Tom B. Phone #: ###-#### Inspection requested via web by Kevin Perez Break room stub wall, (1 receptacle), rough in ok cover
|
Electrical Rough-In | 8/9/2019 | 8/14/2019 | 8/14/2019 | A | PASS |
James Ady
|
|
|
Northeast offices, East and southeast offices and cubicle area ceilings. Please contact Tom at ###-#### Phone #: ###-#### Inspection requested via web by Jason Parke NE open office ok. SE open office and E offices ceiling only ok to cover. Restroom Hard lid and walls ok to cover Note: Previous ceiling inspection Should have Been NE open office area.
|
Electrical Rough-In | 8/8/2019 | 8/9/2019 | 8/9/2019 | A | PASS |
James Ady
|
|
|
Ceiling cover inspection. Contact Tom at ###-#### Phone #: ###-#### Inspection requested via web by Jason Parke NW open offise area ok to cover. All open office area perimeter only ok to cover. NO FULL TILES.
|
Electrical Rough-In | 7/26/2019 | 7/26/2019 | 7/26/2019 | A | PASS |
James Ady
|
|
|
Bathroom area walls Phone #: ###-#### Inspection requested via web by Jason Parke Bathroom and New electrical room walls only ok to cover
|
Electrical Rough-In | 7/15/2019 | 7/16/2019 | 7/16/2019 | A | PASS |
James Ady
|
|
|
Wall rough-in at (2) drinking fountain locations. Phone #: ###-#### Inspection requested via web by Jason Parke N and S hall drinking fountains walls ok to cover
|
Electrical Rough-In | 6/20/2019 | 6/21/2019 | 6/21/2019 | A | PASS |
James Ady
|
|
|
IT Room wall rough in Phone #: ###-#### Inspection requested via web by Jason Parke IT room wall only ok to cover
|
Electrical Rough-In | 6/17/2019 | 6/18/2019 | 6/18/2019 | A | PASS |
James Ady
|
|
|
Conference room and Collaboration room walls Phone #: ###-#### Inspection requested via web by Jason Parke Walls only as marked on print ok to cover
|
Electrical Rough-In | 6/10/2019 | 6/10/2019 | 6/10/2019 | P | PASS |
James Ady
|
|
|
Please call Jason upon arrival to gain access ###-#### Phone #: ###-#### Inspection requested via web by Jason Parke Rough in ok walls only as marked on print
|
Electrical Rough-In | 6/4/2019 | 6/4/2019 | 6/4/2019 | P | PASS |
Rock A. Hudson
|
|
|
Access is limited. Please call Jason when you arrive in the lobby. ###-#### Phone #: ###-#### Inspection requested via web by Jason Parke North and east walls as noted on contractor print rough in ok cover.
|
Issue PAID IN FULL permit | | | 5/28/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/28/2019 | | DONE |
|
|
|
This permit was created on the web by Kevin Perez
|
First Notice | 10/31/2019 | 10/31/2019 | | | |
James Ady
|
|
|
|