Final | 10/17/2019 | 10/17/2019 | 10/17/2019 | P | PASS |
Eric Story
|
|
|
###-#### Final ok
|
Final | 10/7/2019 | 10/7/2019 | 10/7/2019 | P | FAIL |
Rock A. Hudson
|
|
|
Cal Phone #: ###-#### 110.3- Faceless GFCI device in laundry will not reset or trip. 314.25- All boxes shall have covers. Basement ceiling. As per parcel note unable to final until street light repair complete. All other areas in house checked out ok
|
Override - Parcel Holds | 10/7/2019 | 1/1/1900 | 10/7/2019 | | |
|
|
|
this is not the building final
|
Electrical Rough-In | 7/15/2019 | 7/15/2019 | 7/15/2019 | P | PASS |
Rock A. Hudson
|
|
|
Cal- inspection for ground wire Phone #: ###-#### Grounding electrode conductor rough in ok cover
|
Override - Parcel Holds | 7/15/2019 | 1/1/1900 | 7/15/2019 | | |
|
|
|
this inspection has nothing to do with the street lights that the builder needs to fix.
|
Rough-In Permanent Service | 7/4/2019 | 7/5/2019 | 7/5/2019 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by cal crosby Rough-in ok to cover p/s o/h n ok
|
Electrical Rough-In | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | PASS |
James Ady
|
|
|
Cal- groundning inspection Phone #: ###-#### 25ft #4 bare along footing to be used as concrete encased electrode ok to cover
|
Issue PAID IN FULL permit | | | 7/2/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/2/2019 | | DONE |
|
|
|
This permit was created on the web by cal crosby
|
Telephone call | | | 7/2/2019 | | DONE |
|
|
|
customer called and will call back with the fixture count for this project-called back added fixtures and hot tub
|