Site Final | 6/27/2018 | 6/28/2018 | 6/29/2018 | A | PASS |
Andy J. Long
|
|
|
Tim Phone #: ###-####
Parking lot surface and open area has been stabilzed. Silt fence removed and two DI bags removed from MS4 on 4th & Myrtle and on 5th & Broad. ESC permit conditions satisfied.
|
Site Final | 6/19/2018 | 6/19/2018 | 6/19/2018 | P | NR |
Andy J. Long
|
|
|
Need to complete landscaping/stabilization with the ground cover as discussed. Remove silt fence and remove DI bags on 4th and Myrtle and 5th & Broad. Corrections issued onsite to Tanner with ESI
|
Site Preparation | 5/24/2018 | 5/25/2018 | 5/25/2018 | A | PASS |
Michael Zawacki
|
|
|
Tanner Phone #: ###-#### Did site walkthrough with operator. Will monitor for dust and trackout. OK to remove siltfence when time comes for planters and it interferes.
|
Issue & PRINT permit COM | | | 5/23/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 4/10/2018 | | 4/10/2018 | | DONE |
Andy J. Long
|
|
|
ESC plans resubmitted with rest of required info for project. ESCP approved. Certified RP designated. Double fee applied for starting without permits.
|
Telephone call | | | 3/7/2018 | | DONE |
|
|
|
Called Garrett Turpin (applicant on esc application) with ESI and told him need to get zoning approvals and grading permit.
|
Application received | | | 3/7/2018 | | DONE |
|
|
|
change status to pnd
|
Application received | | | 3/6/2018 | | |
|
|
|
|
Routing - Erosion and Sediment | 3/6/2018 | | 3/6/2018 | | PASS |
Andy J. Long
|
|
|
Double ESC permit fee issued for working without permits with no site preparation inspection. Syman Co. RP listed in ESC plan.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/6/2018 | | DONE |
Andy J. Long
|
|
|
|