Site Final | 7/5/2019 | 7/9/2019 | 7/10/2019 | P | PASS |
Andy J. Long
|
|
|
Home complete, landscaped, and occupied. Street, sidewalk and gutter are clean. No ESC requests, permit finaled.
|
General Inspection | 7/4/2019 | 7/4/2019 | 7/5/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/19/2019 | 6/19/2019 | 6/19/2019 | | PASS |
Michael Zawacki
|
|
|
Driveway and rear porch being prepped for concrete. No ESC issues.
|
Site Preparation | 8/27/2018 | 8/28/2018 | 8/28/2018 | A | PASS |
Michael Zawacki
|
|
|
Site has wattle at perimeter that water may run off, community witches hats in DI below. Permit sign posted. Will need to monitor drain in rear, it is slightly uphill and is only at risk from backfill.
|
Issue & PRINT permit SFD | | | 8/27/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/6/2018 | | 8/6/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Certified ESC team designated. Site preparation inspection is REQUIRED at start of project.
|
Application received | | | 7/27/2018 | | |
|
|
|
|