INSP-Final Inspection | 5/31/2018 | 6/7/2018 | 6/7/2018 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. The wet and dry systems were tested today., Devices for elevator recall in place but elevators are incapable of recall at this time.
Ray McQueen, inspecting technician, building is open for access Phone #: ###-#### Inspection requested via web by Rose Peterson
|
INSP-Final Inspection | 5/31/2018 | 6/6/2018 | 6/4/2018 | A | CANC |
Troy Cobbley
|
|
|
Ray McQueen, inspecting technician, building is open for access Phone #: ###-#### >> Inspection requested via web by Rose Peterson Inspection cancelled from web by: Rose Peterson
|
INSP-Final Inspection | 5/31/2018 | 6/4/2018 | 6/4/2018 | P | FAIL |
Troy Cobbley
|
|
|
Today was a partial inspection. See Lee's entry for items tested.
Ray McQueen, inspecting technician, building is open for access Phone #: ###-#### Inspection requested via web by Rose Peterson
|
Inspection | 6/4/2018 | 6/4/2018 | 6/4/2018 | P | PART |
Lee G Meredith
|
|
|
Restest of 3 failed horn strobes, 1 kitchen hood and 1 relocated smoke detector that was too close to fans. All passed.
|
INSP-Final Inspection | 5/25/2018 | 5/31/2018 | 5/31/2018 | A | FAIL |
Troy Cobbley
|
|
|
Partial inspection today. See Lee's entry for items tested/inspected.
Tank, inspecting technician, building is open access Phone #: ###-#### Inspection requested via web by Rose Peterson
|
Inspection | 5/31/2018 | 5/31/2018 | 5/31/2018 | A | PART |
Lee G Meredith
|
|
|
Tested dwelling unit detectors and sounders. Tested notification. Two areas need to be addresses. 2nd floor had horns that did not provide temporal signal, 1st floor had one horn in an admin office that did not sync.
|
INSP-Final Inspection | 5/25/2018 | 5/30/2018 | 5/30/2018 | A | FAIL |
Troy Cobbley
|
|
|
Partial inspection today. See entry by Lee for items tested today.
Nick Tank, inspecting technician, building is open access Phone #: ###-#### Inspection requested via web by Rose Peterson
|
Inspection | 5/30/2018 | 5/30/2018 | 5/30/2018 | A | PART |
Lee G Meredith
|
|
|
Tested corridor smokes, mag door holds and all pull stations.
|
Miscellaneous action | | | 5/30/2018 | | DONE |
|
|
|
Received and reviewed as built drawings showing a substitution for the panel and communicator. These are acceptable and I emailed Rose to inform her.
|
INSP-Final Inspection | 5/25/2018 | 5/29/2018 | 5/29/2018 | A | FAIL |
Troy Cobbley
|
|
|
Today was a partial inspection. We verified that all off the redlined corrections had been made and are shown on the plan modification. The two items that had been missed was the data sheet approved did not match the fire alarm control panel installed and the dialer was not approved/shown. When these two items have been approved we can begin testing of the devices.
Nick Tank, inspecting technician, building is open access Phone #: ###-#### Inspection requested via web by Rose Peterson
|
Plan Modification Accepted | | | 5/14/2018 | | DONE |
|
|
|
|
Alarm Plan Check | 5/14/2018 | | 5/14/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 5/14/2018 | | DONE |
|
|
|
Plan mod approved. No additional review comments.
|
Permit Ready to Issue | | | 5/14/2018 | | DONE |
|
|
|
plan mod-please don't re issue
|
CHANGE STATUS TO (ISS) | | | 5/14/2018 | | DONE |
|
|
|
|
INSP-Final Inspection | 3/28/2018 | 3/29/2018 | 3/29/2018 | P | DONE |
Troy Cobbley
|
|
|
Today I did a walk thru of the second floor. See the city approved plans for sheet signed and dated and with corrections noted in red. The corrections noted are not an absolute list of all items that may need attention. The contractor shall verify that system installation will meet minimum code compliance. The walk thru over the last couple of days did not include the actual testing of any devices. Plan modifications and corrections made in the field will be needed prior to testing of devices.
Nick Tank, inspecting technician Phone #: ###-#### Inspection requested via web by Rose Peterson
|
INSP-Final Inspection | 3/27/2018 | 3/28/2018 | 3/28/2018 | P | DONE |
Troy Cobbley
|
|
|
Today we finished the walk thru for the first floor. See the approved plans that have been dated and signed for the specific areas looked at. I noted added horn/strobes and areas where horn/strobes need to be added. Possibly a manual pull station will need to be added in a stairwell. Plan modifications will be needed.
Ray McQueen, inspecting technician Phone #: ###-#### Inspection requested via web by Rose Peterson
|
INSP-Final Inspection | 3/21/2018 | 3/27/2018 | 3/27/2018 | A | DONE |
Troy Cobbley
|
|
|
Today was a partial inspection. I looked at the control equipment and one first floor wing of the system. I noted that a different FACP panel has been installed, a different communication method has been installed, of the nine NAC panels installled two are different from the rest, all nine are triggered from a single module which is not shown on the plans, the trouble signals are being monitored by two monitor modules that are not shown on the plans, breaker lock is missing, one wall mounted a/v is overspaced as marked on plans, notification needs to be added in the Office with three people in it as marked on the plans. Again this was a partial inspection.
Ray McQueen, inspection technician; building has open availability Phone #: ###-#### Inspection requested via web by Rose Peterson
|
Telephone call | | | 3/27/2018 | | DONE |
|
|
|
Troy called to note there is a beam that exceed 10% of the ceiling heign between the kitchen and living room. He wanted to know if this would require multiple detectors. per 2013 NFPA 72 17.7.3.2.4.2 (5) a single detector is acceptable if the room is under 900 ft. squared. Drawings indicate the rooms are approximately 235 ft squared so this appears to be adequate.
|
INSP-Final Inspection | 3/8/2018 | 3/15/2018 | 3/15/2018 | A | CANC |
Troy Cobbley
|
|
|
Ray McQueen, inspecting technician Open building access Phone #: ###-#### Inspection requested via web by Rose Peterson
|
Miscellaneous action | | | 3/15/2018 | | DONE |
|
|
|
As Built drawings received.
|
Alarm Plan Check | 3/15/2018 | | 3/15/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/15/2018 | | DONE |
|
|
|
As built drawings approved. No fees to be charged.
|
CHANGE STATUS TO (ISS) | | | 3/15/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 3/15/2018 | | DONE |
|
|
|
|
Miscellaneous action | | | 12/11/2017 | | DONE |
|
|
|
3 new product data sheets were for wireless detectors. I emailed Rose to let her know that we currently don't allow wireless devices. She is checking to see if the product data was submitted in error.
|
Miscellaneous action | | | 12/8/2017 | | DONE |
|
|
|
Rose emaile a request to open the workflow for a plan modification upload.
|
Alarm Plan Check | 11/15/2016 | | 11/15/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 11/15/2016 | | DONE |
|
|
|
Plans approved with review comments and drawing notation.
|
Permit Ready to Issue | | | 11/15/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/15/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/15/2016 | | 11/15/2016 | | DONE |
Kristal Soland
|
|
|
|
Plan resubmittals received | | | 11/14/2016 | | DONE |
|
|
|
|
Miscellaneous action | | | 11/14/2016 | | DONE |
|
|
|
Emailed Rose Peterson to inform her that the resubmittal is being returned, without review, due to new files with names that are different that original file names.
|
Plan resubmittals received | | | 11/14/2016 | | DONE |
|
|
|
|
Miscellaneous action | | | 11/14/2016 | | DONE |
|
|
|
Emailed Rose to request product data for non-addressable smoke detectors shown in dining room.
|
1st review completed | | | 11/3/2016 | | FAIL |
|
|
|
Drawings submitted as a single file. Failed pre-screen review and notified Rose that files need to be uploaded individually.
|
Plan assigned to (Lee) | 11/3/2016 | | 11/3/2016 | | DONE |
Lee G Meredith
|
|
|
|
Plan resubmittals received | | | 11/3/2016 | | DONE |
|
|
|
|
1st review completed | | | 11/3/2016 | | FAIL |
|
|
|
See 1st review comments.
|
Miscellaneous action | | | 11/3/2016 | | DONE |
|
|
|
Emailed review comments to Rose Peterson.
|
Application received | | | 11/2/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 2 2016 2:52PM
|