Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberFIR17-00089
StatusFinaled
Name TRIBAL FIRE SYSTEMS
Site Address 8000 S FEDERAL WAY
Project NameMicron Bldg 51 System 30-4
Customer Number 
ePlanReviewYes
Description
[Micron Building 51 - System 30-4 - C24074]
The fire sprinkler scope of work consists of part of the interstitial area. The system is designed as a 6”x4”x 2½” grid. The system is designed based on OH II for 3000 ft² per IFC for Semiconductor H5.

• The underground is under permit FIR16-00701
• See addendum for graphic scope of work

Contractor’s Note:
The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. The changes may affect the sprinkler system. The sprinkler contractor will be obligated to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit, they will do so on their own cognizance. This note does not constitute an early start agreement.

[BLD16-03440] - For the construction of a new one story building with a basement for a fabrication and R&D facility to include related site work. The building includes a 149,327 sq. ft. basement, a 164,022 sq. ft. first story and a 33,638 sq. ft. equipment platform. This building is fully fire sprinklered and alarmed for H occupancy. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/13/20198/13/20198/13/2019PPASS
DetailsJim Page
Final fire sprinkler inspection for scope of work has been completed. Drop downs have been added for future obstruction install, as of these notes it is not clear when obstructions will be placed, a seperate permit will be requested when obstructions are designed and placed. A temp overhead door has been added as well as an open vent grate on the exterior wall, need coverage under overhead door and verify that the sprinkler piping next to open exterior vent will not freeze due to vent being exposed to outside atmosphere. Noted items will need to be addressed before life fire safety inspection. A seperate permit will be required for items noted.
INSP-Sprinkler Rough-in/Hydro8/13/20198/13/20198/13/2019PDONE
DetailsJim Page
Hydrostatic test for this system has been witnessed, no pressure loss was observed.
INSP-Sprinkler Rough-in8/13/20198/13/20198/13/2019PPASS
DetailsJim Page
Rough in inspection for this system has been completed. Drop downs for obstruction coverage are in place but obstructions have not been installed.
Fees Due Hold6/17/2017 9/13/2017 DONE
DetailsBrittany Hill
Fees Due Hold6/15/2017 6/16/2017 DONE
DetailsChristina Prado
Sprinkler Plan Check6/14/2017 6/14/2017 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  6/14/2017 DONE
DetailsTim Frost
Permit Ready to Issue  6/14/2017 DONE
Issue and Print Permit  6/14/2017 DONE
Inspection Record Card- Fire6/14/2017 6/14/2017 DONE
DetailsChristina Prado
Intake Approval  3/7/2017 PASS
Plan assigned to (Tim)3/7/2017 3/7/2017 DONE
DetailsTim Frost
Sprinkler Plan Check3/7/2017 3/7/2017 FAIL
DetailsTim Frost
1st review completed  3/7/2017 FAIL
DetailsTim Frost
Miscellaneous action  3/7/2017 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Application received  2/26/2017 DONE
Application submitted via PDS Online on Feb 26 2017 3:57PM