Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberFIR17-00300
StatusFinaled
Name TRIBAL FIRE SYSTEMS
Site Address 8000 S FEDERAL WAY
Project NameMicron Bldg 51
Customer Number 
ePlanReviewYes
Description
[Micron Building 51 - System 20-11 - C24074]
The fire sprinkler scope of work consists of part of the interstitial area. The system is designed as a 3”x2 3”x 2½” x 2½” grid. The system is designed based on OH II for 3000 ft² per IFC for Semiconductor H5.

• The underground is under permit FIR16-00701
• See addendum for graphic scope of work

[BLD16-03440]
For the construction of a new one story building with a basement for a fabrication and R&D facility to include related site work. The building includes a 157,037 sq. ft. basement, a 170,997 sq. ft. first story and a 33,638 sq. ft. equipment platform. This building is fully fire sprinklered and alarmed for H occupancy. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/12/20198/13/20198/13/2019APASS
DetailsJim Page
Final fire sprinkler inspection for scope of work complete.

Clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
INSP-Sprinkler Rough-in/Hydro8/13/20198/13/20198/13/2019ADONE
DetailsJim Page
Hydrostatic test for this system has been witnessed, no pressure loss was observed.
INSP-Sprinkler Rough-in8/13/20198/13/20198/13/2019APASS
DetailsJim Page
Rough in inspection for this system has been completed.
Fees Due Hold1/9/2018 1/22/2018 DONE
DetailsBrittany Hill
Issue and Print Permit  1/8/2018 DONE
(F) Reprint permit  1/8/2018 DONE
Sprinkler Plan Check1/5/2018 1/5/2018 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  1/5/2018 DONE
DetailsTim Frost
Permit Ready to Issue  1/5/2018 DONE
Plan assigned to (Tim)1/5/2018 1/5/2018 DONE
DetailsTim Frost
Intake Approval  1/5/2018 PASS
Plan assigned to (Tim)12/19/2017 12/20/2017 DONE
DetailsTim Frost
Sprinkler Plan Check12/19/2017 12/20/2017 FAIL
DetailsTim Frost
Intake Approval  12/19/2017 PASS
Application received  6/19/2017 DONE
Application submitted via PDS Online on Jun 19 2017 6:39AM