INSP-Final Inspection | 8/12/2019 | 8/13/2019 | 8/13/2019 | A | PASS |
Jim Page
|
|
|
Final inspection for scope of work has been completed. Catwalks have been added that were outside the scope of work, fire sprinkler coverage will be required for life fire safety to be completed, a seperate permit will be required for obstruction coverage.
Clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Sprinkler Rough-in/Hydro | 8/13/2019 | 8/13/2019 | 8/13/2019 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for this system has been witnessed, no pressure loss was observed.
|
INSP-Sprinkler Rough-in | 8/13/2019 | 8/13/2019 | 8/13/2019 | A | PASS |
Jim Page
|
|
|
Rough in inspection for this system has been completed.
|
Fees Due Hold | 2/28/2018 | | 3/8/2018 | | DONE |
Brittany Hill
|
|
|
|
Fees Due Hold | 1/23/2018 | | 2/27/2018 | | DONE |
Brittany Hill
|
|
|
|
Issue and Print Permit | | | 1/22/2018 | | DONE |
Christina Prado
|
|
|
MIcron project - will be paid by Micron during monthly processing
|
Sprinkler Plan Check | 1/19/2018 | | 1/19/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/19/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/19/2018 | | DONE |
|
|
|
|
Telephone call | | | 1/3/2018 | | DONE |
|
|
|
Spoke with the Assitant Fire Marshal. Explained, the owner would not provide the quanities or type of commodities being used and stored ( solvents, water reactive, slurry and aqueous ) The owner said it was proprietary information.
I explained the design calls for a wet pipe sprinklers protecting a water reactive area. I also explained I had tried to contact the owner in regards to this matter and the phone call was never returned. I asked him to follow up with the owner and let me know how he would like me to proceed. I suggested the owner should provide a letter from their insurance underwrited (FM) stating the area has adequate protection.
|
Miscellaneous action | | | 1/3/2018 | | PEND |
|
|
|
Waiting on Paul to contact Ron in regards to water reactive area and quantities and types of chemicals.
|
Miscellaneous action | | | 1/3/2018 | | PEND |
|
|
|
Waiting on Clarence to tell me the wall rating. If it is not 90 min then additional flow is required in remote area 1
|
Intake Approval | | | 12/20/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 12/20/2017 | | 12/20/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/20/2017 | | 12/20/2017 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 12/20/2017 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 12/20/2017 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 6/19/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 19 2017 6:43AM
|