INSP-Final Inspection | 8/12/2019 | 8/13/2019 | 8/13/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for scope of work has been completed. Piping and ductwork obstructions have been added that were not part of the original scope of work, obstructions will need coverage before life fire safety inspection, a seperate permit will be required for obstruction coverage.
Clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Sprinkler Rough-in | 8/13/2019 | 8/13/2019 | 8/13/2019 | A | PASS |
Jim Page
|
|
|
Rough in inspection for this system has been completed.
|
INSP-Sprinkler Rough-in/Hydro | 8/13/2019 | 8/13/2019 | 8/13/2019 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for this system has been witnessed, no pressure loss was observed.
|
Fees Due Hold | 1/6/2018 | | 1/22/2018 | | DONE |
Brittany Hill
|
|
|
|
Sprinkler Plan Check | 1/5/2018 | | 1/5/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/5/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/5/2018 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/5/2018 | | DONE |
|
|
|
|
1st review completed | | | 12/19/2017 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 12/19/2017 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Sprinkler Plan Check | 12/19/2017 | | 12/19/2017 | | FAIL |
Tim Frost
|
|
|
|
Application received | | | 12/18/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 18 2017 12:37PM
|
Intake Approval | | | 12/18/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 12/18/2017 | | 12/18/2017 | | DONE |
Tim Frost
|
|
|
|