Permit NumberFIR17-00754
StatusFinaled
Name TRIBAL FIRE SYSTEMS
Site Address 8000 S FEDERAL WAY
Project NameMicron BLDG51 SYS 30-3
Customer Number 
ePlanReviewYes
Description
[Micron Building 51 - System 30-3 - C24074]
The fire sprinkler scope of work consists of part of the interstitial area. The system is designed as a 6”x4”x 2½” grid. The system is designed based on OH II for 3000 ft² per IFC for Semiconductor H5.

• The underground is under permit FIR16-00701
• See addendum for graphic scope of work

Contractor’s Note:
The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. The changes may affect the sprinkler system. The sprinkler contractor will be obligated to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit, they will do so on their own cognizance. This note does not constitute an early start agreement.

[BLD16-03440]
For the construction of a new one story building with a basement for a fabrication and R&D facility to include related site work. The building includes a 157,037 sq. ft. basement, a 170,997 sq. ft. first story and a 33,638 sq. ft. equipment platform. This building is fully fire sprinklered and alarmed for H occupancy. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/12/20198/13/20198/13/2019APASS
DetailsJim Page
Final fire sprinkler inspection for scope of work has been completed. Piping and ductwork obstructions have been added that were not part of the original scope of work, obstructions will need coverage before life fire safety inspection, a seperate permit will be required for obstruction coverage.

Clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
INSP-Sprinkler Rough-in8/13/20198/13/20198/13/2019APASS
DetailsJim Page
Rough in inspection for this system has been completed.
INSP-Sprinkler Rough-in/Hydro8/13/20198/13/20198/13/2019ADONE
DetailsJim Page
Hydrostatic test for this system has been witnessed, no pressure loss was observed.
Fees Due Hold1/6/2018 1/22/2018 DONE
DetailsBrittany Hill
Sprinkler Plan Check1/5/2018 1/5/2018 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  1/5/2018 DONE
DetailsTim Frost
Permit Ready to Issue  1/5/2018 DONE
Issue and Print Permit  1/5/2018 DONE
1st review completed  12/19/2017 FAIL
DetailsTim Frost
Miscellaneous action  12/19/2017 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Sprinkler Plan Check12/19/2017 12/19/2017 FAIL
DetailsTim Frost
Application received  12/18/2017 DONE
Application submitted via PDS Online on Dec 18 2017 12:37PM
Intake Approval  12/18/2017 PASS
Plan assigned to (Tim)12/18/2017 12/18/2017 DONE
DetailsTim Frost