INSP-Final Inspection | 4/29/2019 | 4/30/2019 | 4/30/2019 | A | PASS |
Troy Cobbley
|
|
|
Previous correection have been made. Permit is finaled
Phone #: 2088990672 >> Inspection requested via mobile web by Josiah
|
INSP-Final Inspection | 12/17/2018 | 12/17/2018 | 12/17/2018 | P | PART |
Troy Cobbley
|
|
|
Fire alarm work for the Link is complete. Two smoke detectors need to be relocated so that they are centered in the doors at both ends. This will be checked at the next inspection.
phase 1- Adam Phone #: ###-####
|
Plan assigned to (Lee) | 12/5/2018 | | 12/6/2018 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 12/6/2018 | | PASS |
|
|
|
|
Alarm Plan Check | 12/5/2018 | | 12/6/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 12/6/2018 | | DONE |
|
|
|
Quick permit passed. No review comments.
|
Permit Ready to Issue | | | 12/6/2018 | | DONE |
|
|
|
all requirements met
|
Issue and Print Permit | | | 12/6/2018 | | DONE |
|
|
|
|
Application received | | | 12/5/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 5 2018 2:13PM
|