INSP-Final Inspection | 10/8/2019 | 10/11/2019 | 10/11/2019 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection for scope of qwork complete.
We would like the Inspection at 8:am if possible since the Hood System is being finaled at that time. Please call Nate at ###-#### with inspection time. Phone #: ###-#### Inspection requested via web by Lori Brungardt
|
Permit Ready to Issue | | | 10/8/2019 | | DONE |
|
|
|
as built approved
|
CHANGE STATUS TO (ISS) | | | 10/8/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/7/2019 | | DONE |
|
|
|
start workflow for As-Built's per Lori at Alarmco.
|
Plan assigned to (Lee) | 10/7/2019 | | 10/7/2019 | | DONE |
Lee G Meredith
|
|
|
as built workflow started
|
Alarm Plan Check | 10/7/2019 | | 10/7/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 10/7/2019 | | DONE |
|
|
|
As built - No fee.
|
INSP-Final Inspection | 8/7/2019 | 8/12/2019 | 8/9/2019 | A | CANC |
Jim Page
|
|
|
Please call Nate at ###-#### with inspection time. Phone #: ###-#### >> Inspection requested via web by Lori Brungardt Inspection cancelled from web by: Lori Brungardt
|
Plan assigned to (Lee) | 12/12/2018 | | 12/14/2018 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 12/14/2018 | | PASS |
|
|
|
|
Alarm Plan Check | 12/12/2018 | | 12/14/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 12/14/2018 | | DONE |
|
|
|
Plans passed with requirements noted on the drawings and per review comments.
|
Permit Ready to Issue | | | 12/14/2018 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 12/14/2018 | | DONE |
|
|
|
|
Application received | | | 12/12/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 12 2018 3:08PM
|