INSP-Final Inspection | 6/18/2019 | 6/19/2019 | 6/19/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final fire alarm inspection complete.
Phone #: ###-#### Inspection requested via web by Matt Casey
|
INSP-Final Inspection | 6/14/2019 | 6/17/2019 | 6/17/2019 | P | FAIL |
Jim Page
|
|
|
Levels 1 and 2 flow switch labeleing was incorrect, level 1 was reporting as level 2 and level 2 was reporting as level 1.
Mark will handle inspection. Matt is on vacation Phone #: ###-#### Inspection requested via web by Matt Casey
|
Application received | | | 5/10/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 10 2019 12:19AM
|
Plan assigned to (Lee) | 5/10/2019 | | 5/10/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 5/10/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 5/10/2019 | | 5/10/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 5/10/2019 | | DONE |
|
|
|
Passed
|
Permit Ready to Issue | | | 5/10/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 5/10/2019 | | DONE |
|
|
|
|