INSP-Final Inspection | 5/7/2020 | 5/8/2020 | 5/8/2020 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Please give Jim Lewis a call to schedule the inspection time. ###-#### Phone #: ###-#### Inspection requested via web by Joshua Hansen
|
INSP-Sprinkler Rough-in | 5/4/2020 | 5/5/2020 | 5/5/2020 | P | PASS |
Troy Cobbley
|
|
|
The 24 hour air test was witnessed for both dry systems.
This Inspection will be to finish the 24-hour air test started on Monday afternoon. Please give Jim Lewis a call to schedule the inspection time. ###-#### Phone #: ###-#### Inspection requested via web by Joshua Hansen
|
INSP-Sprinkler Rough-in | 5/1/2020 | 5/4/2020 | 5/4/2020 | P | PART |
Troy Cobbley
|
|
|
The overhead hydro 24 hour air test was started for both dry systems at 11:00am with 45psi on both guages.
This inspection will be to start the mandatory 24-Hour air test. Test to be completed Tuesday afternoon. Please give Jim Lewis a call to schedule the inspection time. ###-#### Phone #: ###-#### Inspection requested via web by Joshua Hansen
|
INSP-Sprinkler Rough-in/Hydro | 5/1/2020 | 5/4/2020 | 5/4/2020 | A | PASS |
Troy Cobbley
|
|
|
New overhead hydro test witnessed for both new dry pipe systems and header. Please give Jim Lewis a call to schedule the inspection time. ###-#### Phone #: ###-#### Inspection requested via web by Joshua Hansen
|
Telephone call | | | 4/29/2020 | | DONE |
|
|
|
sent email afpco@altafireprotection.com about $35
|
CHANGE STATUS TO (ISS) | | | 4/29/2020 | | DONE |
|
|
|
|
Plan assigned to (Stumbaugh) | 4/24/2020 | | 4/28/2020 | | DONE |
Mark Stumbaugh
|
|
|
plan mod
|
Sprinkler Plan Check | 4/28/2020 | | 4/28/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/28/2020 | | DONE |
Mark Stumbaugh
|
|
|
2hr review time
No new devices
|
Permit Ready to Issue | | | 4/28/2020 | | DONE |
|
|
|
PLAN MOD
|
Plan Modification Accepted | | | 4/24/2020 | | DONE |
|
|
|
Josh from Alta Fire requested a plan mod workflow opened
|
INSP-Sprinkler Rough-in/Hydro | 4/22/2020 | 4/23/2020 | 4/23/2020 | P | PASS |
Troy Cobbley
|
|
|
The rough-in passed for the piping mods. 200lb hydro test passed for the pipe mods.
Please give Jim Lewis a call to schedule the inspection time. ###-#### Phone #: ###-#### Inspection requested via web by Joshua Hansen
|
Plan assigned to (Stumbaugh) | 4/17/2020 | | 4/20/2020 | | DONE |
Mark Stumbaugh
|
|
|
plan mod
|
Sprinkler Plan Check | 4/20/2020 | | 4/20/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/20/2020 | | DONE |
Mark Stumbaugh
|
|
|
2 hrs review time
no new devices
|
Permit Ready to Issue | | | 4/20/2020 | | DONE |
|
|
|
Plan Mod Accepted
|
CHANGE STATUS TO (ISS) | | | 4/20/2020 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 4/17/2020 | | DONE |
|
|
|
Josh Hansen from Alta fire requested a plan mod workflow started
|
INSP-Final Inspection | 4/14/2020 | 4/16/2020 | 4/16/2020 | A | CANC |
Troy Cobbley
|
|
|
Not ready per contact. please contact Jim Lewis with any questions about this inspection he is on site ###-#### Phone #: ###-#### Inspection requested via web by Joshua Hansen
|
INSP-Final Inspection | 4/14/2020 | 4/16/2020 | 4/16/2020 | A | CANC |
Troy Cobbley
|
|
|
Not ready per contact. please contact Jim Lewis with any questions about this inspection he is on site ###-#### Phone #: ###-#### Inspection requested via web by Joshua Hansen
|
INSP-Final Inspection | 4/2/2020 | 4/9/2020 | 4/9/2020 | P | FAIL |
Troy Cobbley
|
|
|
Total trip time was 1:55, it can not exceed 60 seconds. Also need ceiling and pendant installed in the Data Room.
Please call Jim Lewis if you have any questions he is on site ###-#### Phone #: ###-#### Inspection requested via web by Joshua Hansen
|
INSP-Sprinkler Rough-in | 4/8/2020 | 4/9/2020 | 4/9/2020 | A | PASS |
Troy Cobbley
|
|
|
24 hour air test witnessed with no pressure loss. Please give a Jim Lewis a call for inspection time. Phone #: ###-#### Inspection requested via web by Joshua Hansen
|
INSP-Sprinkler Rough-in/Hydro | 4/2/2020 | 4/8/2020 | 4/8/2020 | A | PART |
Jim Page
|
|
|
Hydrostatic test has been witnessed, no pressure loss was observed. 24 hour air test started at 11AM @ 45PSI.
Please call Jim Lewis if any questions on this inspection he is on site Phone #: ###-#### Inspection requested via web by Joshua Hansen
|
INSP-Sprinkler Rough-in | 4/8/2020 | 4/8/2020 | 4/8/2020 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work is complete, approved for cover, except for data room. City approved drawings show a ceiling in the data room, as of this entry there is no ceiling and according to the point of contact a ceiling is not going to be installed. If no ceiling is installed then data room must comply with the 2016 NFPA13, section 8.15.23 or install ceiling as shown on city approved drawings with pendant protection.
|
Plan resubmittals received | | | 11/12/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 11/12/2019 | | 11/12/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/12/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 11/12/2019 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/12/2019 | | DONE |
|
|
|
|
Sprinkler Plan Check | 11/4/2019 | | 11/8/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Plan resubmittals received | | | 11/4/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 10/21/2019 | | 10/23/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 10/23/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Intake Approval | | | 10/21/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 10/21/2019 | | 10/21/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Intake Approval | | | 10/17/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Intake Approval | | | 10/14/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Application received | | | 10/11/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 11 2019 2:45PM
|