INSP-Final Inspection | 6/23/2020 | 6/24/2020 | 6/24/2020 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection is complete.
Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
CHANGE STATUS TO (ISS) | | | 5/19/2020 | | DONE |
|
|
|
|
Plan assigned to (Stumbaugh) | 5/11/2020 | | 5/13/2020 | | DONE |
Mark Stumbaugh
|
|
|
plan mod
|
Sprinkler Plan Check | 5/13/2020 | | 5/13/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/13/2020 | | DONE |
Mark Stumbaugh
|
|
|
Review Time 1hr
No new devices
|
Permit Ready to Issue | | | 5/13/2020 | | DONE |
|
|
|
Plan Mod Met
|
Plan Modification Accepted | | | 5/11/2020 | | DONE |
|
|
|
Nate requested a plan mod to be started.
|
INSP-Sprinkler Rough-in | 4/15/2020 | 4/15/2020 | 4/15/2020 | P | PASS |
Jim Page
|
|
|
Tenting has been corrected, all tenting in place at time of inspection, cover is approved.
|
INSP-Sprinkler Rough-in/Hydro | 4/15/2020 | 4/15/2020 | 4/15/2020 | P | DONE |
Jim Page
|
|
|
Hydrostatic test witnessed, no pressure loss observed at riser provided gauge.
Hydro and tenting, call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 4/13/2020 | 4/13/2020 | 4/13/2020 | P | FAIL |
Jim Page
|
|
|
System lost 20psi during hydro. Tenting has been comprimised by other trades, cover is no longer autorized, a re-inspection for tenting is required. Cover sticker has been removed, any and all cover material installed before tenting re-inspection that prevents a visual inspection of the pipe will be required to be removed. Hydro RE-inspection. Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 4/8/2020 | 4/9/2020 | 4/9/2020 | P | CANC |
Jim Page
|
|
|
Cancelled per conversation with point of contact, will be rescheduled for a later date.
Hydrostatic test Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 3/25/2020 | 3/26/2020 | 3/26/2020 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping is complete. All tenting in place at time of inspection, cover is approved. Cover approval sticker has been placed.
Overhead rough/tenting, call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
Issue and Print Permit | | | 3/11/2020 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/24/2020 | | 2/26/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/26/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 2/26/2020 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/24/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 1/30/2020 | | 2/6/2020 | | FAIL |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 2/6/2020 | | FAIL |
Mark Stumbaugh
|
|
|
|
Intake Approval | | | 1/30/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 1/30/2020 | | 1/30/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Application received | | | 1/29/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 29 2020 1:13PM
|