INSP-Final Inspection | 6/17/2020 | 6/18/2020 | 6/18/2020 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection is complete.
Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
Telephone call | | | 5/19/2020 | | DONE |
|
|
|
emailed anthony on fee accidently missed and needing to be paid
|
CHANGE STATUS TO (ISS) | | | 5/19/2020 | | DONE |
|
|
|
|
Sprinkler Plan Check | 5/13/2020 | | 5/13/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/13/2020 | | DONE |
Mark Stumbaugh
|
|
|
Review Time 1hr
No new devices
|
Permit Ready to Issue | | | 5/13/2020 | | DONE |
|
|
|
plan mod
|
Plan Modification Accepted | | | 5/11/2020 | | DONE |
|
|
|
Nate requested a plan mod
|
Plan assigned to (Stumbaugh) | 5/11/2020 | | 5/11/2020 | | DONE |
Mark Stumbaugh
|
|
|
Plan mod
|
INSP-Sprinkler Rough-in/Hydro | 4/8/2020 | 4/9/2020 | 4/9/2020 | P | DONE |
Jim Page
|
|
|
Hydrostaic test for overhead fire sprinkler piping has been witnessed, no pressure loss observed at riser provided gauge.
Hydrostatic test Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 3/19/2020 | 3/20/2020 | 3/20/2020 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, all tenting in place at time of inspection, cover is approved. Approval sticker has been placed.
Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 3/19/2020 | 3/19/2020 | 3/19/2020 | P | FAIL |
Jim Page
|
|
|
Open 1 1/2 outlet and 1 inch outlet open above finish ceiling, inspection stopped.
Overhead rough ; tenting, call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
Issue and Print Permit | | | 3/11/2020 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/24/2020 | | 2/26/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/26/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 2/26/2020 | | DONE |
|
|
|
met
|
Plan resubmittals received | | | 2/24/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 1/30/2020 | | 2/7/2020 | | FAIL |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 2/7/2020 | | FAIL |
Mark Stumbaugh
|
|
|
|
Intake Approval | | | 1/30/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 1/30/2020 | | 1/30/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Application received | | | 1/29/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 29 2020 2:44PM
|