Final | 9/9/2019 | 9/10/2019 | 9/10/2019 | P | PASS |
Brian Scoles
|
|
|
Please call Pat prior to arrival at ###-#### Phone #: ###-#### Inspection requested via web by Maira Napoles- final ok
|
Final | 8/7/2019 | 8/8/2019 | 8/8/2019 | P | PART |
Brian Scoles
|
|
|
Please call Pat prior to arrival at ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Maira Napoles- gas piping on roof ok- pressure tested under other mech permit- hydronic piping and insulation ok meets 25/50 flame smoke spread- need to add drip leg between shuoff valve and regulator on gas piping to boilers- rest is good- will look at this on other mech contractors final for dry side
|
Mec-Aging Inspection | 7/15/2019 | 7/15/2019 | 7/15/2019 | | FAIL |
Brian Scoles
|
|
|
needs called in for cover inspection
|
Rough-in | 4/15/2019 | 4/15/2019 | 4/15/2019 | A | PASS |
Brian Scoles
|
|
|
Please call Patrick prior to arrival at ###-####. Phone #: ###-#### Inspection requested via web by Maira Napoles- 2nd floor 100lb hydronic test pass
|
Rough-in | 2/20/2019 | 2/21/2019 | 2/21/2019 | A | PASS |
Brian Scoles
|
|
|
Rough-in on first-floor eastside. Please call Patrick prior to arrival at ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Maira Napoles- R/I ok 1st floor- pipe insulation needs to be plenum rated
|
Pressure Test | 2/21/2019 | 2/21/2019 | 2/21/2019 | A | PASS |
Brian Scoles
|
|
|
Rough-in on first-floor eastside. Please call Patrick prior to arrival at ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Maira Napoles- 1st floor only 100# test on hydronics pass- ok for insulation
|
Issue PAID IN FULL permit | | | 7/5/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/5/2018 | | DONE |
|
|
|
This permit was created on the web by Maira Napoles
|
First Notice | 9/10/2019 | 9/10/2019 | | | |
Brian Scoles
|
|
|
|