Final | 10/2/2019 | 10/3/2019 | 10/3/2019 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Bob Ferrin- final ok
|
Rough-in | 7/25/2019 | 7/25/2019 | 7/25/2019 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Bob Ferrin- crawl ok
|
Rough-in | 7/23/2019 | 7/24/2019 | 7/24/2019 | A | FAIL |
Brian Scoles
|
|
|
Crawl is complete Phone #: ###-#### Inspection requested via web by Bob Ferrin- ducting in crawl needs to maintain 4" off ground- insultion on wye branches is coming off and exposed fiberglass showing- some ducts are pinched between main supply and joist- recall in when corrections are made
|
Rough-in | 7/1/2019 | 7/2/2019 | 7/2/2019 | A | PART |
Brian Scoles
|
|
|
Preston Phone #: ###-####- R/I ok ok to sheetrock- crawl wet contractor will schedule another R/I inspection when crawls completed
|
Rough-in | 6/28/2019 | 7/1/2019 | 7/1/2019 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Bob Ferrin- 1- need approved man j onsite for inspection 2- seal all spot welds on return air registers 3- remove hanger straps on csst in walls and use csst nail plate in bedroom at ceiling to bbq 4- secure all gas line in high garage to trusses 5- crawls need completed on R/I 6- dryer duct needs to maintain 4" round smashed by nail plate at ceiling needs notched bigger
|
Pressure Test | 7/1/2019 | 7/1/2019 | 7/1/2019 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Bob Ferrin- 20lb gas pass tagged meter location
|
Review - MECHANICAL | 7/1/2019 | 7/1/2019 | 7/1/2019 | | DONE |
Chad Schwendiman
|
|
|
Revised acca report
|
Issue PAID IN FULL permit | | | 6/28/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/28/2019 | | DONE |
|
|
|
This permit was created on the web by Bob Ferrin
|