Information based on query as of Monday, May 6, 2024.
Permit Information
Permit NumberBLD16-02990
StatusIssued
Name TWO PLANK CONSTRUCTION
Site Address 4809 W MORRIS HILL RD
Project Name 
Customer Number 
ePlanReviewNo
Description
**8-22-16 Plan Modification as per new submitted plans. The rear staircase will remain as is. No additional exterior staircase will be added. No additional Bathroom will be added to Main Floor, existing will be remodeled. No work will be done to the Main Floor Kitchen. ** Permit to remove (2) existing stairways in existing home and replace with one exterior stairway to Basement. Main floor to have a Bedroom added to stair area (egress windows to be added), new Bathroom added, existing Kitchen removed and replaced, 2nd stairway area to become Pantry/Rear Entry. Basement currently has a Kitchen-Range to be removed, 220 and venting to be capped and/or removed (no Range can be installed without Duplex requirements being meet), existing window in Basement Bedroom to be verified as meeting egress requirements, window well to code is to be added,mechanical (HVAC) to be removed, exterior door to new exterior stairs to be added. Ductless HVAC is proposed to replace existing HVAC system (new system to meet all current codes for single family dwellings). Engineering has been provided for exterior retaining wall, stairs, floor replacement and header openings. Existing Garage to be demolished and driveway to be paved. New roof to be installed with overhangs added. Existing exterior to be modified, new sheathing w/ house wrap, r10 rigid insulation and stucco finish. All work to be done according to plans, notes, review notes and local codes. **BJM**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/13/20203/16/20203/16/2020PNR
DetailsTell Riley
TJ Phone #: ###-####//not quite ready for final//discussed areas to finish and need mech and plumbing final//
BLD-Aging Inspection1/31/20201/31/20202/4/2020 DONE
DetailsTell Riley
Expires: 03/16/20
BLD-Aging Inspection1/30/20201/30/20202/3/2020 CANC
DetailsTell Riley
BLD-Wall cover9/18/20199/18/20199/18/2019PPASS
DetailsTell Riley
call ahead // TJ Phone #: ###-####//mechanical complete//ok to cover//
BLD-Framing/Rough-in9/16/20199/16/20199/16/2019PPART
DetailsTell Riley
TJ Phone #: ###-####//need mechanical rough inspection prior to cover//call in after complete//
BLD-Conference12/17/201812/17/201812/17/2018ACANC
DetailsJim Sly
Phone Jess ###-####
BLD-Conference11/23/201811/23/201811/23/2018PDONE
DetailsJim Sly
TJ Phone #: ###-####
BLD-Framing/Rough-in2/6/20172/6/20172/6/2017PPART
DetailsTony Young
TJ Phone #: ###-####,, front bedroom ceiling beam ok
BLD-Framing/Rough-in10/31/201611/1/201611/1/2016APART
DetailsJim Sly
TJ Phone #: ###-####
Verified Micro lam in attic....9' long W. bedroom.
BLD-Conference9/30/201610/4/201610/4/2016PDONE
DetailsJim Sly
TJ Phone #: ###-####
OK to cover bathroom.