Information based on query as of Saturday, May 11, 2024.
Permit Information
Permit NumberBLD16-03129
StatusFinaled
Name CBH HOMES
Site Address 12053 W HIAWATHA DR
Project Name3-5 Peppermill
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 2423 sq. ft., two story (first story 1042 sq. ft., second story 1381 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 112 sq. ft. of covered patio/porch and a 684 sq. ft. attached garage per the approved plans, and any notations. R-1C zoning and setbacks per planning. **DAF**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/5/20176/6/20176/6/2017APASS
DetailsMike Jordan
Brett Phone #: ###-####
DOC - Permit Finaled6/6/20176/6/20176/6/2017PPASS
DetailsMike Jordan
BLD-Energy code compliance3/2/20173/3/20173/3/2017APASS
DetailsMike Jordan
Brett Phone #: ###-####
BLD-Framing/Rough-in3/1/20173/2/20173/2/2017ADONE
DetailsMike Jordan
Brett Phone #: ###-####
BLD-Framing/Rough-in2/28/20173/1/20173/1/2017PPASS
DetailsMike Jordan
Brett Phone #: ###-####
BLD-Wall Bracing2/21/20172/22/20172/22/2017APASS
DetailsMike Jordan
BLD-Wall Bracing2/21/20172/21/20172/21/2017PPART
DetailsMike Jordan
Brett Phone #: ###-####. Install the missed blocking 2nd. floor behind the tub and nail.
BLD-Foundation1/30/20171/31/20171/31/2017PDONE
DetailsMike Jordan
Dane Phone #: ###-####
BLD-Footing1/27/20171/30/20171/30/2017PCANC
DetailsMike Jordan
Dane Phone #: ###-####
BLD-Foundation1/30/20171/30/20171/30/2017PPART
DetailsMike Jordan
Dane Phone #: ###-####
BLD-Footing1/25/20171/26/20171/26/2017PPART
DetailsMike Jordan
Dane Phone #: ###-####
BLD-Footing12/23/201612/27/201612/27/2016PCANC
DetailsMike Jordan
Dane Phone #: ###-####
BLD-Footing12/22/201612/23/201612/27/2016PNR
DetailsJim Sly
Dane Phone #: ###-####
BLD-Footing12/21/201612/22/201612/22/2016PNR
DetailsJim Sly
Dane Phone #: ###-####
Not even dug yet
BLD-Footing12/20/201612/21/201612/21/2016PNR
DetailsMike Jordan
dane Phone #: ###-####. footings not excavated.
BLD-Footing12/19/201612/20/201612/20/2016PCANC
DetailsMike Jordan
dane Phone #: ###-####
BLD-Footing12/16/201612/19/201612/19/2016PCANC
DetailsMike Jordan
dane Phone #: ###-####
BLD-Footing12/15/201612/16/201612/16/2016PCANC
DetailsMike Jordan
dane Phone #: ###-####
BLD-Footing12/14/201612/15/201612/15/2016PCANC
DetailsMike Jordan
Dane Phone #: ###-####