Permit Information
Permit NumberBLD16-04223
StatusFinaled
Name BARGREEN ELLINGSON INC
Site Address 1140 N ALLUMBAUGH ST
Project NameValley View Sr. Living - Hood
Customer Number 
ePlanReviewYes
Description
(VALLEY VIEW SENIOR LIVING – KITCHEN TYPE I HOOD AND DUCT) The fire sprinkler system is used for occupancy and for building area increase. To install a Type I grease hood and duct system within a new 169 square foot kitchen to serve an I-2 Occupancy Skilled Nursing Facility. Work is to include cutting holes in a 1-hr fire-resistance-rated floor-ceiling assembly, cutting holes in a 1-hr fire-resistance-rated roof-ceiling assembly, and structurally reinforcing the floor and roof. The grease duct and the make-up air duct are each required to be within a separate 1-hr shaft, minimum. Special Inspection required for epoxy anchors. Verification of the capacity of the floor and roof to support the new equipment is a deferred submittal item. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/5/201811/8/201811/8/2018PPASS
DetailsMike Jordan
Please call me when you''re expected to be on site and I will meet you there. Phone #: ###-#### Inspection requested via web by Stephen Lee
DOC - Permit Finaled11/8/201811/8/201811/8/2018PPASS
DetailsMike Jordan
All issues have been resolved. ok for final.
BLD-Conference10/31/201810/31/201810/31/2018PPASS
DetailsMike Jordan
Review of fire shaft and first layer of fire rated gypsum board. Work commences at 8:30, please call if you have time earlier to stop by. If first layer is installed, will call to have you come by an inspect. Phone #: ###-#### Inspection requested via web by Stephen Lee
BLD-Conference9/29/201810/1/201810/1/2018APASS
DetailsMike Jordan
Please call prior to arrival, I will meet you onsite. Earlier in the AM preferred. Phone #: ###-#### Inspection requested via web by Stephen Lee. Angle supports added per plan and noted special inspection reports. Ok to fire proof new supports.
BLD-Conference9/27/20189/28/20189/28/2018PCANC
DetailsMike Jordan
Please call prior to arrival and I will meet you onsite. This conference is for you to inspect the structural bracing that was just installed on 09/26/2018. Phone #: ###-#### >> Inspection requested via web by Stephen Lee Inspection cancelled from web by: Stephen Lee
BLD-Conference7/11/20187/12/20187/12/2018PDONE
DetailsMike Jordan
afternoon between 1:45 and 3:45 for review of fire shaft correction notice. Please call me before you plan on going out so I can meet you there. Phone #: ###-#### Inspection requested via web by Stephen Lee. Discussed repairs with contractor and their proposed solutions prior to moving foward.
BLD-Conference7/10/20187/11/20187/11/2018PCANC
DetailsMike Jordan
Reschedule for tomorrow afternoon between 1:45 and 3:45 for review of fire shaft correction notice. Please call me before you plan on going out so I can meet you there. Phone #: ###-#### Inspection requested via web by Stephen Lee. rescheduled for tomorow afternoon.
BLD-Conference7/10/20187/11/20187/10/2018ACANC
DetailsMike Jordan
Please call Stephen prior to heading over, I will meet you onsite. The site is available to meet between 8:45 am to 10:45 am. in the morning, if those times do not work for your schedule then we have another window between 1:45 to 3:45 in the afternoon. This is to review the fire shaft correction notice. Phone #: ###-#### >> Inspection requested via web by Stephen Lee Inspection cancelled from web by: Stephen Lee
BLD-Final5/6/20185/9/20185/9/2018AFAIL
DetailsMike Jordan
Please contact Stephen Lee when on your way, I will meet you there. Phone #: ###-#### Inspection requested via web by Stephen Lee. Provide the UL for the double wall grease duct from captive air showing 1hr. assembly and fireblock detail at penetrations. Make up air duct needs to be wrapped or in 1hr shaft for entire length. Provide UL and method for wrapping make up air duct and firestop details at penetrationns. Install all structural components as shown on Sheet A1-1.. Provide special inspection for epoxt bolting. correction notice issued.
FIRE-Final Inspection5/2/20185/3/20185/3/2018PPASS
DetailsTroy Cobbley
Life safety passed.

call on your way- Steve Phone #: ###-####