Permit NumberBLD17-01767
StatusFinaled
Name WRIGHT BROTHERS THE BLDG CO EAGLE
Site Address 7000 W STATE ST
Project NameNorthgate Facade Remodel
Customer NumberEARLY START BLD17-03276
ePlanReviewYes
Description
(NORTHGATE SHOPPING CENTER) For exterior improvements to the existing building with work to include removal and replacement of the the canopy areas including new footings and columns per the appproved plans. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  5/23/2019 DONE
passed final on 5-21-2019
BLD-Final5/20/20195/21/20195/21/2019PPASS
DetailsTony Young
Re inspection Phone #: ###-#### Inspection requested via web by Josh Strasser,, received letter from engineer,, ok
BLD-Final5/16/20195/16/20195/16/2019PPART
DetailsTony Young
I will be on site today
Josh Strasser Phone #: ###-#### Inspection requested via web by Josh Strasser,, ok pending final okay letter from engineer
BLD-Wall Bracing1/22/20191/23/20191/23/2019APASS
DetailsJim Sly
Sheer inspection Area D Phone #: ###-#### Inspection requested via web by Josh Strasser
BLD-Wall cover1/18/20191/22/20191/22/2019PDEFR
DetailsDave Hannah
Sheer inspection Area D Phone #: ###-#### Inspection requested via web by Josh Strasser out of time
BLD-Framing/Rough-in1/15/20191/16/20191/16/2019PPASS
DetailsTony Young
Area D to the Left of Rite Aid. Final area of the Northgate Remodel. Phone #: ###-#### Inspection requested via web by Josh Strasser
BLD-Framing/Rough-in1/14/20191/15/20191/15/2019ANR
DetailsTony Young
Area D to the Left of Rite Aid. Final area of the Northgate Remodel. Phone #: ###-#### Inspection requested via web by Josh Strasser,, needs trades 1st,, fire and electrical
BLD-Framing/Rough-in12/27/201812/27/201812/27/2018PPART
DetailsTony Young
Partial Sheer framing rough in Area E (Rite Aid) Phone #: ###-#### Inspection requested via web by Josh Strasser,, nailing ok
BLD-Wall Bracing12/7/201812/10/201812/10/2018APART
DetailsTony Young
Sheer Partial Phone #: ###-#### Inspection requested via web by Josh Strasser,, work in progress,, rite aid section,, ok
BLD-Wall Bracing12/5/201812/5/201812/5/2018PPART
DetailsBrandon Shaw
Partial strapping and clips to sheet walls
BLD-Wall Bracing11/28/201811/29/201811/29/2018APART
DetailsJim Storey
Partial Roof cover and wall cover to get water tight in the area from above. Phone #: ###-#### Inspection requested via web by Josh Strasser stud framing ok at roof rafters and bearing walls w/sheer clips per plan// 18x24 plate steel to cmu wall rfi as to two difernent bolt sizes not on plan need verrifacation as built is ok
BLD-Aging Inspection11/21/201811/21/201811/26/2018 PEND
DetailsTony Young
BLD-Aging Inspection11/20/201811/20/201811/26/2018 CANC
DetailsTony Young
BLD-Wall cover7/9/20187/9/20187/9/2018APART
DetailsTony Young
Area F Front of Goodwill Shear for Cover Phone #: ###-#### Inspection requested via web by Josh Strasser,, ok after renailing some areas of face and soffit,, see paint notes
BLD-Wall cover7/2/20187/2/20187/2/2018APART
DetailsTony Young
Sheer inspection Area F and G
Josh Phone #: ###-#### Inspection requested via web by Josh Strasser,, ok after re-doing a few areas
BLD-Framing/Rough-in6/22/20186/22/20186/22/2018PPART
DetailsTony Young
Theater Breezeway Shear to Metro PCS. Framing and Rough in Front of Goodwill Phone #: ###-#### Inspection requested via web by Josh Strasser,, see paint notes
BLD-Wall cover6/5/20186/6/20186/10/2018PPASS
DetailsTony Young
Area F,G,H Approve for cover
Area I Shear Nail Approve for cover Phone #: ###-#### Inspection requested via web by Josh Strasser
BLD-Wall Bracing5/14/20185/15/20185/15/2018APASS
DetailsTony Young
Area K Sheer Liquor store area Phone #: ###-#### Inspection requested via web by Josh Strasser,,
BLD-Wall Bracing5/14/20185/14/20185/15/2018PPART
DetailsTony Young
Area K Sheer Liquor store area Phone #: ###-#### Inspection requested via web by Josh Strasser,, work in progress
BLD-Wall Bracing5/11/20185/14/20185/14/2018ADEFR
DetailsTony Young
Area K Sheer Liquor store area Phone #: ###-#### Inspection requested via web by Josh Strasser
BLD-Wall cover5/11/20185/11/20185/11/2018PNR
DetailsTony Young
Area K Sheer Liquor store area Phone #: ###-#### Inspection requested via web by Josh Strasser,, need to re-do some areas,,
BLD-Framing/Rough-in5/2/20185/2/20185/2/2018PPART
DetailsTony Young
Area J and K From Liquor Store to Mongolian Phone #: ###-#### Inspection requested via web by Josh Strasser,, ok pending trades
BLD-Wall cover4/10/20184/10/20184/10/2018PPART
DetailsTony Young
Sheer inspection Area C early PM if possible Phone #: ###-#### Inspection requested via web by Josh Strasser,, work in progress,, re-nail some areas,, needs 3/8" on sides
BLD-Wall Bracing4/5/20184/6/20184/9/2018PPASS
DetailsTony Young
Partial Area C
Reinspect sheer partial Area C
Josh Strasser Phone #: ###-#### Inspection requested via web by Josh Strasser
BLD-Framing/Rough-in4/4/20184/5/20184/5/2018PPART
DetailsTony Young
Partial Area C
Reinspect sheer partial Area C
Josh Strasser Phone #: ###-#### Inspection requested via web by Josh Strasser,, work in progress,, needs sprinklers passed
BLD-Wall Bracing4/3/20184/4/20184/4/2018PPASS
DetailsTony Young
Partial Area C Sheer Phone #: ###-#### Inspection requested via web by Josh Strasser
BLD-Wall cover4/2/20184/3/20184/3/2018PPART
DetailsTony Young
Partial Area C Sheer Phone #: ###-#### Inspection requested via web by Josh Strasser// work in progress,, needs some intermediate nailing/screws
BLD-Framing/Rough-in3/20/20183/20/20183/20/2018PPART
DetailsJim Sly
Partial Area C Phone #: ###-#### Inspection requested via web by Josh Strasser
Area C OK.
BLD-Framing/Rough-in3/9/20183/12/20183/12/2018APART
DetailsTony Young
Partial for Area A and west side of Area B
Josh Strasser Phone #: ###-#### Inspection requested via web by Josh Strasser,, ok pending trades in this area,, by vape
BLD-Framing/Rough-in3/9/20183/9/20183/9/2018PPART
DetailsTony Young
Partial for Area A and west side of Area B
Josh Strasser Phone #: ###-#### Inspection requested via web by Josh Strasser,, need more screws,, also trades
BLD-Wall Bracing2/20/20182/21/20182/21/2018APART
DetailsTony Young
Partial A Wall sheeting for cover Phone #: ###-#### Inspection requested via web by Josh Strasser,, late am,, fasteners ok per ICC report,, shear ok to cover
BLD-Wall cover2/20/20182/20/20182/20/2018PNR
DetailsTony Young
Partial A Wall sheeting for cover Phone #: ###-#### Inspection requested via web by Josh Strasser,, need to redo per plan,, need equivalent for the fasteners
BLD-Framing/Rough-in2/13/20182/14/20182/14/2018PPART
DetailsTony Young
Partial Area A for cover. Late PM Phone #: ###-#### Inspection requested via web by Josh Strasser,, west end of Area A ok
BLD-Wall Bracing2/1/20182/1/20182/1/2018PPART
DetailsTony Young
Partial for roof sheathing.
Josh Strasser Phone #: ###-#### Inspection requested via web by Josh Strasser,, frame members ok above Sallys and Weightwatchers
BLD-Foundation11/14/201711/15/201711/15/2017APASS
DetailsMike Jordan
Pouring 3 Piers at 1:15 PM I pier in front of the gold store
1 pier front of old hall mark
1 pier in front of old blockbuster Phone #: ###-#### Inspection requested via web by Josh Strasser
BLD-Footing10/30/201710/31/201710/31/2017APART
DetailsBrandon Shaw

7 Footings 3 Piers Area A and C
BLD-Footing10/26/201710/27/201710/27/2017APART
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Josh Strasser
Strata OK'd sub grade......STRATA inspecting rebar.....1st 5 footing pads starting from West end.