BLD - Resubmittal Approved | 8/30/2019 | 8/30/2019 | 8/30/2019 | P | DEFR |
Brandon Shaw
|
|
|
. Phone #: ###-#### Inspection requested via web by Jon King
|
BLD-Conference | 8/28/2019 | 8/29/2019 | 8/29/2019 | A | PEND |
Dave Hannah
|
|
|
Issue CN that permit will be expired if required inspections not requested left message to contact me priject is at sheetrock stage framing and insulate is all good jest need to finish and get finals
|
BLD-Energy code compliance | 6/28/2018 | 6/29/2018 | 6/29/2018 | P | NR |
Dave Hannah
|
|
|
Dusty Phone #: ###-####
|
BLD-Framing/Rough-in | 6/26/2018 | 6/27/2018 | 6/27/2018 | P | NR |
Dave Hannah
|
|
|
call when on way // Dusty Phone #: ###-#### needs air seal mec rough in and truss enginering
|
BLD-Wall Bracing | 6/26/2018 | 6/26/2018 | 6/26/2018 | P | PASS |
Jim Storey
|
|
|
Please call ahead or access - Dusty Phone #: ###-#### engineering ok for garage// need to blk common wall for gyp
|
BLD-Wall Bracing | 1/3/2018 | 1/3/2018 | 1/3/2018 | P | PEND |
Brandon Shaw
|
|
|
Provide Engineering approval for "as built" wall bracing. As per plans, SSW 24X10 brace panels (5) to be at garage door portal (2) and at south garage wall (3) OK to cover exterior
|
BLD-Foundation | 9/27/2017 | 9/27/2017 | 9/28/2017 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Jon King
|
BLD-Footing | 9/8/2017 | 9/8/2017 | 9/11/2017 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Jon King
|
BLD-Conference | 8/30/2019 | 9/3/2019 | | A | |
Dave Hannah
|
|
|
|