Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD17-03394
StatusFinaled
Name BENCHMARK DEVELOPMENT COMPANY LLC
Site Address 3764 W TWILIGHT DR
Project NameLane Residence
Customer Number 
ePlanReviewYes
Description
**PLAN MODIFICATION 7-30-19 - GRADING AND DRAINAGE, Eliminating one set of landscape stairs and modifying the remaining set of landscape stairs.** ""WUI ZONE A REQUIREMENTS"" Permit for the construction of a new 3040 sq. ft., two story (first story 1058 sq. ft., second story 950 sq. ft. basement 1032 sq. ft.) single family dwelling with 5 bedrooms, 3.5 bathrooms, approximately 521 sq. ft. of covered patio/porch and a 586 sq. ft. attached garage per the approved plans, plan review report and any notations. Special inspections required per the attached form 310. R-1C zoning and setbacks per planning.

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  11/12/2019 DONE
Per BLD Final Inspection on 9/4/19
BLD-Final9/4/20199/4/20199/4/2019PDONE
DetailsTony Young
Tim Phone #: ###-####
BLD-Final9/3/20199/4/20199/4/2019APASS
DetailsTony Young
Gim Phone #: ###-####
BLD-Blower Door Test Results9/4/20199/4/20199/4/2019PDONE
DetailsTony Young
Tim Phone #: ###-####/// 1.6
BLD-Final9/3/20199/3/20199/3/2019PNR
DetailsTony Young
Gim Phone #: ###-####
BLD-Final8/27/20198/28/20198/28/2019AFAIL
DetailsTony Young
Call to meet // Tim Phone #: ###-####,, c/n posted,, guardrail openings, firewall, smoke detector, blower door test, address posted visible from Twilight, window fall protection, plans, etc
BLD-Other6/10/20196/11/20196/11/2019ADONE
DetailsTony Young
check on soffits,, not called in for inspection,, ok,, verified sheetrock
BLD-Other6/3/20196/4/20196/10/2019ADEFR
DetailsTony Young
need to check on soffits,, not called in for inspection
BLD-Aging Inspection5/30/20195/30/20196/5/2019 PEND
DetailsTony Young
BLD-Energy code compliance1/14/20191/15/20191/15/2019APASS
DetailsTony Young
Tim Phone #: ###-####
BLD-Framing/Rough-in1/11/20191/14/20191/14/2019ANR
DetailsTony Young
Tim Phone #: ###-####,, still needing plate lines sealed up
BLD-Framing/Rough-in1/11/20191/11/20191/11/2019PPART
DetailsTony Young
Tim Phone #: ###-####,, need to seal plate lines,, maintain fire blocking
BLD-Other12/4/201812/5/201812/5/2018APART
DetailsTony Young
Tim Phone #: ###-####,, soffit work in progress,, ok
BLD-Framing/Rough-in12/4/201812/4/201812/4/2018PPART
DetailsTony Young
Tim Phone #: ###-####,, needs fire blocking, seal plates.. nail hangers off,, ok to insulate
BLD-Foundation7/26/20187/26/20187/26/2018PPART
DetailsTony Young
Need a wall rebar inspection. Phone #: ###-#### Inspection requested via web by Tim Nau, ok to pour/grout walls after completing the rebar
BLD-Footing7/17/20187/18/20187/18/2018PPART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Tim Nau,, garage footing
BLD-Footing7/17/20187/17/20187/17/2018PPEND
DetailsTony Young
Need inspection on garage footing. MTI performed soil inspection and compaction tests. Hoping to pour at 3pm.
Thanks Phone #: ###-#### Inspection requested via web by Tim Nau/// needs soils approval
BLD-Foundation6/15/20186/18/20186/18/2018APART
DetailsTony Young
Trying to pour at 10:15. Had inspection set up for last Friday afternoon and this may be a follow up inspection from that. Phone #: ###-#### Inspection requested via web by Tim Nau,, work in progress,, ok
BLD-Foundation6/15/20186/15/20186/15/2018PPART
DetailsTony Young
Tim Phone #: ###-####,, work in progress on main house walls
BLD-Foundation6/15/20186/15/20186/15/2018PCANC
DetailsTony Young
Looking for the latest inspection we can possibly get this afternoon in preparation for a Monday morning pour.
Thanks Phone #: ###-#### >> Inspection requested via web by Tim Nau Inspection cancelled from web by: Tim Nau
BLD-Foundation5/18/20185/18/20185/18/2018PPART
DetailsTony Young
Requesting concrete retaining wall inspection. Phone #: ###-#### Inspection requested via web by Tim Nau,, work in progress,, back retaining wall at the back of the basement,, front stairway to the house walls
BLD-Footing4/27/20184/27/20184/30/2018PPART
DetailsTony Young
Mana Phone #: ###-####,, stair footings,, fcs blocks
BLD-Footing4/18/20184/19/20184/19/2018PPART
DetailsTony Young
Mana Phone #: ###-####,, upper basement footings ok