Information based on query as of Monday, May 13, 2024.
Permit Information
Permit NumberBLD17-03734
StatusFinaled
Name HAYDEN HOMES IDAHO LLC
Site Address 1287 N TYRA AVE
Project NameUmpqua
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 2578 sq. ft., two story (first story 1527 sq. ft., second story 1051 sq. ft.) single family dwelling with 5 bedrooms, 2.5 bathrooms, approximately 64 sq. ft. of covered patio/porch and a 517 sq. ft. attached garage per the approved plans. R-1C zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/19/20182/20/20182/20/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Philip Yates
DOC - Permit Finaled2/20/20182/20/20182/20/2018PPASS
DetailsMike Jordan
BLD-Final2/15/20182/16/20182/16/2018PFAIL
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Philip Yates c/n
BLD-Energy code compliance1/11/20181/12/20181/12/2018APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Tom Wells
BLD-Energy code compliance1/10/20181/11/20181/11/2018PCANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Tom Wells Inspection cancelled from web by: Tom Wells
BLD-Framing/Rough-in1/9/20181/10/20181/10/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Tom Wells
BLD-Framing/Rough-in1/4/20181/5/20181/5/2018AFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Tom Wells. Plumbing rough in inspection failed. Install the additional SDS screws on LVL's as shown on approved plans Provide additional studs, both ends of FG01 2ply truss. Roll block floor joist at cantilever on garage wall. provide blocking on interior shaer wall, 2nd floor, by stairs. Justify pluming penetrations on fllor joist at garage and above bathroom by stairs.9 Only pre punch allowed with in six inches at end of floor joist. Install the floor to floor holdown as shown on the plans. Correction notice posted.
BLD-Wall Bracing12/19/201712/20/201712/20/2017APASS
DetailsDave Hannah
Shear // Zane Phone #: ###-####
BLD-Footing11/21/201711/21/201711/21/2017APART
DetailsMike Jordan
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell. Nees to install reinforcement in column pad footings and provide 10 inch depth at column pad footings.