BLD-Final | 5/4/2018 | 5/4/2018 | 5/4/2018 | P | PASS |
Mike Jordan
|
|
|
Cody Phone #: ###-####
|
DOC - Permit Finaled | 5/4/2018 | 5/4/2018 | 5/4/2018 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 5/3/2018 | 5/4/2018 | 5/3/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Per verbal agreement the existing red fire lane painting will be extended to the west end of the building complex next week when stripping occurs.
Cody Phone #: ###-####
|
BLD-Framing/Rough-in | 3/8/2018 | 3/9/2018 | 3/9/2018 | A | PASS |
Mike Jordan
|
|
|
Cody-partial Phone #: ###-####
|
BLD-Framing/Rough-in | 2/23/2018 | 2/26/2018 | 2/26/2018 | A | PASS |
Mike Jordan
|
|
|
Partial/conference - Cody Phone #: ###-####. Exterior steel stud framing for ne facade at dead on archery main enterance, and remaining facade on north west corner of building.
|
BLD-Framing/Rough-in | 2/16/2018 | 2/16/2018 | 2/20/2018 | P | PASS |
Dave Hannah
|
|
|
Cody Phone #: ###-####
|
FIRE-Conference | 2/16/2018 | 2/16/2018 | 2/16/2018 | P | DONE |
Troy Cobbley
|
|
|
Conference was to discuss whether fire sprinkler protection would be required in the new canopy. Per the fire review comments none are required with conditions
Cody Phone #: ###-####
|
BLD-Framing/Rough-in | 2/13/2018 | 2/13/2018 | 2/13/2018 | P | PASS |
Mike Jordan
|
|
|
Bays 3 and 4 ok.
|
BLD-Framing/Rough-in | 2/7/2018 | 2/7/2018 | 2/7/2018 | P | PASS |
Mike Jordan
|
|
|
Cody-partial-infront of the Ace Hardware Phone #: ###-####. Exterior steel stud framing for new facade at bays 5 and 6.
|
BLD-Framing/Rough-in | 1/31/2018 | 1/31/2018 | 1/31/2018 | P | PASS |
Mike Jordan
|
|
|
Egor-Partial framing Phone #: ###-####. Exterior steel stud framed walls and for canopys and columns for new facade on space A and B.
|
BLD-Framing/Rough-in | 1/24/2018 | 1/25/2018 | 1/25/2018 | A | PASS |
Mike Jordan
|
|
|
Igor Phone #: ###-####. Bays 1 to 5 exterior flutting cover with steel studs ok. ok to cover with the 1/2 inch fire rated ply wood.
|