Information based on query as of Friday, May 10, 2024.
Permit Information
Permit NumberBLD17-04413
StatusFinaled
Name CM COMPANY
Site Address 335 W JULIA DAVIS DR
Project NameZoo Boise
Customer NumberBLD17-03885 EPLAN
ePlanReview 
Description
(ZOO BOISE) (C4 Gibbon & Mixed Species) Permit for the construction of a new 2225 exibit and viewing area with work to include the construction of two structures connected with a shade structure per the approved plans. These two structures are considered one building. CDM NOTE:
Two Elevation Certificates will be required; one prior to any vertical construction, and one based upon finished construction. These certificates will need to be reviewed and approved by Public Works staff prior to occupancy approval. Jason Taylor 208-608-7171.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/8/20197/8/20197/9/2019PPASS
DetailsDave Hannah
Pending Elevation certs. Certs have been sent to Jason Tayler via email. Phone #: ###-#### Inspection requested via web by Brandon Reynolds
BLD-Final6/3/20196/5/20196/5/2019PPEND
DetailsDave Hannah
Final Building Occ Centennial Plaza Temp Occ Phone #: ###-#### Inspection requested via web by Brandon Reynolds ok aftewr elec final
BLD-Final3/5/20193/5/20193/5/2019APART
DetailsDave Hannah
Temp Occ Phone #: ###-#### Inspection requested via web by Brandon Reynolds ok to load cages
BLD-Final3/1/20193/4/20193/5/2019PCANC
DetailsDave Hannah
Temp Occ Phone #: ###-#### Inspection requested via web by Brandon Reynolds
FIRE-Final Inspection3/1/20193/4/20193/4/2019APASS
DetailsJim Page
Final life fire safety inspection for area of work complete.

Permit numbers at the bottom of the page dont match because all drawings were submitted in a set. Phone #: ###-#### Inspection requested via web by Brandon Reynolds
FIRE-Final Inspection2/28/20193/1/20193/1/2019ACANC
DetailsJim Page
Rescheduled per conversation with point of contact.

Brandon Phone #: ###-####
BLD-Final3/1/20193/1/20193/1/2019PCANC
DetailsDave Hannah
Looking for Temp Occupency Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
BLD-Final2/26/20193/1/20193/1/2019PCANC
DetailsDave Hannah
No option for fire life safety, call with questions. Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
BLD-Final2/26/20192/27/20192/26/2019PCANC
DetailsDave Hannah
No option for fire life safety final. Call with questions Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
BLD-Framing/Rough-in10/23/201810/24/201810/24/2018APASS
DetailsDave Hannah
Roddy Phone #: ###-####
BLD-Foundation9/27/201810/1/201810/1/2018APEND
DetailsDave Hannah
We need a grout/rebar inspection on building C4 Monday morning. Grout scheduled for 1pm. Phone #: ###-#### Inspection requested via web by Justin Palm ok after spec inspection
BLD-Footing9/17/20189/18/20189/18/2018APASS
DetailsDave Hannah
Rebar at CMU walls C4 gibbon exhibit. Grouting in afternoon. Phone #: ###-#### Inspection requested via web by Brandon Reynolds
BLD-Foundation9/13/20189/14/20189/14/2018ACANC
DetailsDave Hannah
Masonry Rebar inspection for C5 in Centennial site Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
BLD-Footing8/7/20188/8/20188/9/2018PPASS
DetailsDave Hannah
There will be a footing pour the following day, Thursday, at 5am. Inspection can be as late as 3:30pm on Wednesday the 8th. Phone #: ###-#### Inspection requested via web by Justin Palm
BLD-Concrete8/7/20188/9/20188/7/2018ACANC
DetailsDave Hannah
Column footing to be poured early morning. Expecting mud at 5am. There is an additional footing pour happening on site, same day/same time, different building and permit number. I will put in for an individual inspection, just know its all on the same job site. Number listed is for Savannah, she will be on site. Phone #: ###-#### >> Inspection requested via web by Justin Palm Inspection cancelled from web by: Justin Palm
BLD-Foundation7/25/20187/26/20187/26/2018APASS
DetailsDave Hannah
Stem wall pour. Concrete is scheduled for noon via Brundage Bone pump. MTI will be on site to inspect rebar and concrete. Phone #: ###-#### Inspection requested via web by Justin Palm
BLD-Footing7/19/20187/20/20187/23/2018ADONE
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Justin Palm
BLD-Concrete8/22/20188/23/2018 A 
DetailsDave Hannah
Need a rebar inspection for slab on grade. Size of the slab is approximately 10''x17'' >> Inspection requested via web by Justin Palm