BLD-Final | 10/31/2018 | 10/31/2018 | 10/31/2018 | P | PASS |
Mike Jordan
|
|
|
Brian Phone #: ###-####. All issues have been resolved. ok for perm occ.
|
BLD-Final | 10/30/2018 | 10/30/2018 | 10/30/2018 | P | NR |
Mike Jordan
|
|
|
Brain Phone #: ###-####. Needs to complete handrail extensions
|
FIRE-Final Inspection | 10/26/2018 | 10/29/2018 | 10/29/2018 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
Brain Phone #: ###-####
|
FIRE-Final Inspection | 10/24/2018 | 10/25/2018 | 10/25/2018 | A | FAIL |
Troy Cobbley
|
|
|
Provide immediate shutdown for the hvac unit and correct the sample tube orientation, provide sticker at the main exit and indicator as discussed
Brian Phone #: ###-####
|
BLD-Final | 7/5/2018 | 7/6/2018 | 7/6/2018 | P | PART |
Jim Sly
|
|
|
Brian Phone #: ###-#### Remodeled area appears to be OK. See previous Fire inspector notes. All trades appear to be completed in remodeled area.
|
FIRE-Final Inspection | 7/5/2018 | 7/6/2018 | 7/6/2018 | A | PART |
Troy Cobbley
|
|
|
The remodeled area life safety is passed. Before a final the exit lights/emergency lights/exit discharge lights for the north side bay and the south side bay garage door needs to be installed and tested, also the main exit will need its discharge light, sticker, and indicator.
Brian Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | PASS |
Mike Jordan
|
|
|
Brain Phone #: ###-####
|
BLD-Energy code compliance | 5/8/2018 | 5/8/2018 | 5/8/2018 | P | PASS |
Mike Jordan
|
|
|
Brian Phone #: ###-####
|
BLD-Framing/Rough-in | 5/8/2018 | 5/8/2018 | 5/8/2018 | P | PASS |
Mike Jordan
|
|
|
Brian Phone #: ###-####. Hardlids ok. fireblocking ok.
|
BLD-Wall cover | 4/17/2018 | 4/18/2018 | 4/18/2018 | A | PASS |
Mike Jordan
|
|
|
Brian Phone #: ###-####. Interior steel stud framed walls ok. Need to fireblock at fur out walls and encapsulate old foam insulation at old wlak in coolers with non combustible.
|