Permit Information
Permit NumberBLD17-04595
StatusFinaled
Name ST LUKES HEALTH SYSTEM LTD
Site Address 701 E MORRISON KNUDSEN PLAZA DR
Project NameSt. Lukes WGP@ Suite #400
Customer Number 
ePlanReviewYes
Description
(ST. LUKES WGP2 – 4TH FLOOR SUITE #400) This building is Not Fire Sprinklered. Permit is to remodel an existing 25,444 sq. ft. fourth floor business space. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, removal of select suspended acoustic ceiling, removal of select plumbing fixtures, removal of select millwork, construction of select interior non-bearing walls to create select 1-hour rated corridor walls, (20) offices, (2) wellness rooms, a file room, a communication room, (3) conference rooms, open office areas and an accessible women’s restroom, select new door/door frames, select new suspended acoustic and gypsum ceiling, new light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/6/20189/7/20189/7/2018APASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by rocky donica
DOC - Permit Finaled9/7/20189/7/20189/7/2018PPASS
DetailsJim Sly
FIRE-Final Inspection9/5/20189/5/20189/5/2018PPASS
DetailsJim Page
Fire alarm inspection is complete, final life fire safety inspection for area of work complete.
BLD-Final8/30/20188/31/20188/31/2018ACANC
DetailsTony Young
Phone #: ###-#### Inspection requested via web by rocky donica,, needs fire 1
FIRE-Final Inspection8/29/20188/29/20188/29/2018ACANC
DetailsTroy Cobbley
Phone #: ###-#### >> Inspection requested via web by rocky donica Inspection cancelled from web by: rocky donica
BLD-Final8/29/20188/30/20188/29/2018ACANC
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by rocky donica Inspection cancelled from web by: rocky donica
BLD-Final7/30/20187/30/20188/1/2018PDONE
DetailsDave Hannah
Please call when you get there // Rocky Phone #: ###-####
FIRE-Final Inspection8/1/20188/1/20188/1/2018APART
DetailsJim Page
Partial final inspection for life fire safety TCO complete, fire sprinkler inspection is complete, fire extinguishers are in place with current inspection tags, fire alarm permit is still in under review status due to changes to the existing fire alarm system (FIR18-00355, fire alarms are active, if city approved drawings do not match install then corrections will be required to match city approved drawings). When fire alarm permit is finaled then life fire safety can be finaled as well. 30 day TCO authorized for life fire safety
BLD-Final7/31/20188/1/20188/1/2018APART
DetailsDave Hannah
Rocky-would like to try and get a temp c of o Phone #: ###-#### ok for tco ok for perm co after all other trades go perm
FIRE-Final Inspection7/31/20187/31/20187/31/2018PCANC
DetailsJim Page
Office partitions/cubicles need to be in place before life fire safety inspection can be completed for fire extinguisher placement and to verify spacing. This request is cancelled.

Rocky Phone #: ###-####
BLD-Final7/31/20187/31/20187/31/2018ACANC
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by rocky donica
BLD-Ceiling Grid Inspection7/3/20187/5/20187/5/2018APASS
DetailsDave Hannah
Zak Phone #: ###-####
BLD-Framing/Rough-in4/24/20184/25/20184/25/2018APASS
DetailsDave Hannah
Ken Phone #: ###-#### 4th floor