Information based on query as of Friday, May 10, 2024.
Permit Information
Permit NumberBLD17-04624
StatusFinaled
Name PETRA INC
Site Address 2120 S HUDSON AVE
Project NameSkyline Apartments BLDG B
Customer NumberBLD17-04623 IN EPLAN
ePlanReview 
Description
(Building B)(SKYLINE APARTMENTS – BUILDING TYPE 2, Building A, B, C, E, G and J) (24 Units)PLAN MOD RELOCATE WAHER/DRYER FROM BATHROOM TO HALLWAY ADD CLOSED DOOR AS NOTED ON APPROVED PLANS 7-2-18**AJS**The NFPA 13-R fire sprinkler system is used for occupancy and for story increase. To construct a 25,320 square foot three story VB Type of Construction apartment building (8,458 sq. ft. 1st story and 8,431 sq. ft. 2nd story and 8,431 sq. ft. 3rd story). Each unit is 1 story. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud bearing walls, wood stud shear walls, fiberglass shingles, 1-hr dwelling unit separations, 1 hour fire barriers for stair and breezeways, rated doors in breezeway, interior nonbearing walls, millwork, and finishes. Special Inspection is NOT required. The roof truss design is a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13-R as regulated by the Fire Department. Separate fire sprinkler permits shall be obtained prior to beginning any modification or installation work on such systems. **ajs**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection10/14/201910/14/201910/16/2019 PASS
DetailsJim Storey
BLD-Aging Inspection8/13/20198/13/20198/15/2019 PASS
DetailsJim Storey
zoning temp.
BLD-Final6/13/20196/13/20196/13/2019PPASS
DetailsJim Storey
issues resolved. re-inspection for Building final Phone #: ###-#### Inspection requested via web by J.C. Murray final ok
BLD-Final6/11/20196/12/20196/12/2019PNR
DetailsJim Storey
Building final. Phone #: ###-#### Inspection requested via web by J.C. Murray need handrail 12 inches top and bottom// under stair protection.
BLD-Final6/11/20196/11/20196/11/2019PNR
DetailsJim Storey
Building final. Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Final5/30/20195/31/20195/31/2019PNR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by J.C. Murray
FIRE-Final Inspection5/30/20195/31/20195/31/2019APASS
DetailsJim Page
Fire sprinkler inspection complete, fire al;arm inspection complete, fire extinguishers are placed with current inspection tags, knox box is located by fire sprinkler riser room. Final life fire safety inspection complete, fire alarms must be monitored after occupancy.

Fire / Life ; Safety Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Ceiling Grid Inspection2/14/20192/14/20192/14/2019PPASS
DetailsJim Storey
Building B south 12 units. drop ceiling for cover. fire caulking. Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Wall cover2/1/20192/1/20192/1/2019PPASS
DetailsJim Storey
Building B - north 12 units. drop ceiling for cover, fire caulking. Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Energy code compliance1/10/20191/11/20191/11/2019APASS
DetailsMike Jordan
Bld B - south 12 energy, insulation and tenting. Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Framing/Rough-in12/28/201812/28/201812/28/2018PPASS
DetailsJim Storey
Bld B - south 12 fire caulking/ framing Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Energy code compliance12/28/201812/28/201812/28/2018PPASS
DetailsJim Storey
Bld -B: north 12 units. insulation and RC Channel Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Framing/Rough-in12/21/201812/21/201812/21/2018PPASS
DetailsJim Storey
Bld B - north 12 unit framing and fire caulking. Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Framing/Rough-in12/6/201812/7/201812/7/2018PPASS
DetailsJim Storey
Bld B - interior framing and fire caulking Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Framing/Rough-in11/14/201811/15/201811/15/2018APASS
DetailsJim Storey
Bld B - roof truss engineering Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Framing/Rough-in11/13/201811/14/201811/14/2018APART
DetailsJim Storey
Bld B - roof truss engineering and interior framing. Phone #: ###-#### Inspection requested via web by J.C. Murray no engineering
BLD-Framing/Rough-in11/12/201811/13/201811/13/2018ACANC
DetailsJim Sly
Bld B
rough framing interior, truss engineering . Phone #: ###-#### Inspection requested via web by J.C. Murray
Called in wrong Bldg.
BLD-Framing/Rough-in11/6/201811/7/201811/7/2018APASS
DetailsJim Storey
Building B. exterior nailing, straps Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Framing/Rough-in11/1/201811/2/201811/2/2018APASS
DetailsJim Storey
Bld B; foundation to building anchor bolts, hold downs and titan bolts. Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Framing/Rough-in9/14/20189/19/20189/19/2018APASS
DetailsJim Storey
slab on grade shear walls, center and south sections.

Building B Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Framing/Rough-in9/4/20189/5/20189/5/2018PPART
DetailsJim Sly
partial 1st floor shear wall north end. Bld B. Inspection requested via web by J.C. Murray
Interior layers.....OK.
BLD-Foundation7/25/20187/25/20187/25/2018PPASS
DetailsJim Storey
Manual Phone #: ###-####
BLD-Footing7/20/20187/20/20187/20/2018PPASS
DetailsJim Storey
manuel Phone #: ###-####