BLD-Final | 9/26/2019 | 9/27/2019 | 9/27/2019 | P | PASS |
Brandon Shaw
|
|
|
call rob 2089990578 Phone #: ###-#### Inspection requested via web by J.C. Murray
|
DOC - Permit Finaled | 9/27/2019 | 9/27/2019 | 9/27/2019 | P | PASS |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 9/26/2019 | 9/27/2019 | 9/27/2019 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, heat trace inspection has been completed, fire extinguishers are placed with current inspection tags. Final life fire safety inspection is complete, signatures have been provided on final sign off card for associated trades.
call rob 2089990578 Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Ceiling Grid Inspection | 7/11/2019 | 7/12/2019 | 7/12/2019 | A | PART |
Jim Storey
|
|
|
Bld K , west side tower. drop ceilings for cover. Fire Caulking Phone #: ###-#### Inspection requested via web by J.C. Murray 3 spk oversized face layer gyp holes to fire stop/ ele 1 st floor over seized hole
|
BLD-Energy code compliance | 5/28/2019 | 5/29/2019 | 5/29/2019 | A | PASS |
Brandon Shaw
|
|
|
bld K - west side energy code compliance, insulation. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Energy code compliance | 5/15/2019 | 5/16/2019 | 5/16/2019 | A | PASS |
Jim Storey
|
|
|
Bld K - east side insulation. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 5/8/2019 | 5/9/2019 | 5/9/2019 | A | PASS |
Jim Storey
|
|
|
Bld K - fire caulking Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 3/20/2019 | 3/21/2019 | 3/21/2019 | A | PASS |
Jim Storey
|
|
|
Bld K; framing inspection; anchor bolts, hold downs, straps, exterior nailing and truss engineering. Phone #: ###-#### Inspection requested via web by J.C. Murray 480 c/n pass.
|
BLD-Wall Bracing | 3/12/2019 | 3/12/2019 | 3/13/2019 | P | CANC |
Brandon Shaw
|
|
|
First floor hold downs; exterior sheathing and shear walls and straps, good to go... Third floor, Rm 303, need truss Engineering fix or approval for A5A installed in wrong location...
|
BLD-Wall Bracing | 12/13/2018 | 12/14/2018 | 12/14/2018 | A | PART |
Jim Sly
|
|
|
Craig Phone #: ###-#### 25 lin. ft of 2 walls..East end of Bldg. K 1st floor.
|
BLD-Foundation | 8/9/2018 | 8/10/2018 | 8/10/2018 | A | PASS |
Jim Storey
|
|
|
Manual Phone #: ###-####
|
BLD-Footing | 8/7/2018 | 8/7/2018 | 8/7/2018 | P | PASS |
Brandon Shaw
|
|
|
Manuel Phone #: ###-####
|