Permit NumberBLD17-04631
StatusFinaled
Name PETRA INC
Site Address 2087 S HUDSON AVE
Project NameSkyline Apartments
Customer NumberBLD17-04623 IN EPLAN
ePlanReview 
Description
Building K: (SKYLINE APARTMENTS- BUILDING TYPE 5, Building K) (24 Units)PLAN MOD RELOCATE WAHER/DRYER FROM BATHROOM TO HALLWAY ADD CLOSED DOOR AS NOTED ON APPROVED PLANS 7-2-18**AJS**The NFPA 13-R fire sprinkler system is used for occupancy and for story increase. The Maximum Allowable Area Allowed was calculated for this building being the largest in the project. To construct a 30,498 square foot three story VB Type of Construction apartment building (10,184 sq. ft. 1st story 10,157 sq. ft. 2nd story 10,157 sq. ft. 3rd story. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud bearing walls, wood stud shear walls, fiberglass shingles, 1-hr dwelling unit separations, 1-hour fire barriers for stair and breezeways, rated doors in breezeway, interior nonbearing walls, millwork, and finishes. Special Inspection is NOT required. The roof truss design is a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13-R as regulated by the Fire Department. Separate fire sprinkler permits shall be obtained prior to beginning any modification or installation work on such systems. **ajs**192 unit apartment project with (9) apartment buildings, clubhouse, and associated site work
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/26/20199/27/20199/27/2019PPASS
DetailsBrandon Shaw
call rob 2089990578 Phone #: ###-#### Inspection requested via web by J.C. Murray
DOC - Permit Finaled9/27/20199/27/20199/27/2019PPASS
DetailsBrandon Shaw
FIRE-Final Inspection9/26/20199/27/20199/27/2019APASS
DetailsJim Page
Fire sprinkler inspection is complete, fire alarm inspection is complete, heat trace inspection has been completed, fire extinguishers are placed with current inspection tags. Final life fire safety inspection is complete, signatures have been provided on final sign off card for associated trades.

call rob 2089990578 Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Ceiling Grid Inspection7/11/20197/12/20197/12/2019APART
DetailsJim Storey
Bld K , west side tower. drop ceilings for cover. Fire Caulking Phone #: ###-#### Inspection requested via web by J.C. Murray 3 spk oversized face layer gyp holes to fire stop/ ele 1 st floor over seized hole
BLD-Energy code compliance5/28/20195/29/20195/29/2019APASS
DetailsBrandon Shaw
bld K - west side energy code compliance, insulation. Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Energy code compliance5/15/20195/16/20195/16/2019APASS
DetailsJim Storey
Bld K - east side insulation. Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Framing/Rough-in5/8/20195/9/20195/9/2019APASS
DetailsJim Storey
Bld K - fire caulking Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Framing/Rough-in3/20/20193/21/20193/21/2019APASS
DetailsJim Storey
Bld K; framing inspection; anchor bolts, hold downs, straps, exterior nailing and truss engineering. Phone #: ###-#### Inspection requested via web by J.C. Murray 480 c/n pass.
BLD-Wall Bracing3/12/20193/12/20193/13/2019PCANC
DetailsBrandon Shaw
First floor hold downs; exterior sheathing and shear walls and straps, good to go...
Third floor, Rm 303, need truss Engineering fix or approval for A5A installed in wrong location...
BLD-Wall Bracing12/13/201812/14/201812/14/2018APART
DetailsJim Sly
Craig Phone #: ###-####
25 lin. ft of 2 walls..East end of Bldg. K 1st floor.
BLD-Foundation8/9/20188/10/20188/10/2018APASS
DetailsJim Storey
Manual Phone #: ###-####
BLD-Footing8/7/20188/7/20188/7/2018PPASS
DetailsBrandon Shaw
Manuel Phone #: ###-####