BLD-Final | 8/2/2018 | 8/3/2018 | 8/2/2018 | A | PASS |
Jim Sly
|
|
|
Tucker Phone #: ###-#### OK for Perm Occ.
|
BLD-Final | 7/30/2018 | 7/31/2018 | 7/31/2018 | A | PART |
Jim Sly
|
|
|
Requesting partial for TCO. Phone #: ###-#### Inspection requested via web by Tucker Robb OK for Temp Occ. OK for Perm Occ. when Plumbing final is Perm.
|
BLD-Final | 7/30/2018 | 7/30/2018 | 7/30/2018 | P | NR |
Jim Sly
|
|
|
Please call Tucker Robb when on the way. Phone #: ###-#### Inspection requested via web by Tucker Robb Need Plumbing final.
|
FIRE-Final Inspection | 7/30/2018 | 7/30/2018 | 7/30/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 7/27/2018 | 7/30/2018 | 7/30/2018 | A | CANC |
Jim Sly
|
|
|
Final inspection for occupancy. Please call ahead. Phone #: ###-#### >> Inspection requested via web by Tucker Robb Inspection cancelled from web by: Tucker Robb
|
FIRE-Final Inspection | 7/25/2018 | 7/27/2018 | 7/27/2018 | P | FAIL |
Troy Cobbley
|
|
|
Need the project related fire alarm permit finaled then life safety can be passed
Fire/Life safety. Please call Tucker when on the way. Phone #: ###-#### Inspection requested via web by Tucker Robb
|
FIRE-Conference | 7/10/2018 | 7/10/2018 | 7/10/2018 | P | DONE |
Troy Cobbley
|
|
|
The project superintendant and I discussed the requirement for a fire alarm permit for the work being performed and also the need for a racking permit for the existing storage racks that exceed 8'
|
BLD-Conference | 6/12/2018 | 6/13/2018 | 6/13/2018 | A | DONE |
Jim Sly
|
|
|
Requesting a a conference to discuss existing exit lights. The plan reviewer noted that exit lights shall be provided at all exits in the building. Existing exits already have exit lights and I want to make sure the inspector is ok with those and that the note in my drawings does not require replacement of existing.
Please call ahead. Phone #: ###-#### Inspection requested via web by Tucker Robb
|
BLD-Energy code compliance | 5/25/2018 | 5/29/2018 | 5/29/2018 | P | PASS |
Jim Sly
|
|
|
Requesting insulation and wall cover inspection. Please call Tucker when on the way. Phone #: ###-#### Inspection requested via web by Tucker Robb
|
BLD-Wall cover | 5/25/2018 | 5/25/2018 | 5/25/2018 | A | CANC |
Jim Sly
|
|
|
Exterior wall insulation inspection for cover. Please call Tucker when on the way. Phone #: ###-#### >> Inspection requested via web by Tucker Robb Inspection cancelled from web by: Tucker Robb
|
BLD-Framing/Rough-in | 5/11/2018 | 5/14/2018 | 5/14/2018 | A | PART |
Jim Storey
|
|
|
Please call Tucker Robb when inspector is in route. Phone #: ###-#### Inspection requested via web by Tucker Robb// framing ok pending ele aproval/ need ec insp.
|