Permit Information
Permit NumberBLD18-00596
StatusFinaled
Name LM CONSTRUCTION CO LLC
Site Address 8485 S FEDERAL WAY
Project NameFederal Way Industrial Bldg
Customer Number 
ePlanReviewYes
Description
(FEDERAL WAY INDUSTRIAL BUILDING – Shell and Core) This building is fire sprinklered in accordance with NFPA 13 with 60 ft yards for unlimited area. Permit for the construction of a new 117,432 sq. ft., 1-story concrete tilt-up shell building and associated site work. Scope of work includes: construction of slab on grade concrete foundation, concrete tilt up construction, construction of new steel bar-joist roof framing / steel pan deck, electrical, mechanical, plumbing. All work shall comply with the approved plans, DRH17-00143 and all applicable codes. Utilizes ANSI/ASHREA 90.1. Special Inspections Required, see form 310. A separate permit is required prior to occupying this structure and a separate racking permit is required if racks are installed over 8 feet in height. Separate permits will be required for the building fire protection systems, as regulated by the Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection1/30/20191/31/20191/31/2019PPASS
DetailsJim Page
Final life fire safety inspection for core and shell complete.

Michael Phone #: ###-####
BLD-Final1/30/20191/31/20191/31/2019PPASS
DetailsJim Storey
Michael Phone #: ###-####
DOC - Permit Finaled1/31/20191/31/20191/31/2019PPASS
DetailsJim Storey
FIRE-Final Inspection1/29/20191/30/20191/30/2019PCANC
DetailsJim Page
Michael Phone #: ###-####-1--30-19 Mike called and cancelled
BLD-Conference1/23/20191/24/20191/24/2019ADONE
DetailsJim Storey
Courtesy inspection for mezzanine walls // Mike Phone #: ###-####
BLD-Framing/Rough-in1/22/20191/23/20191/23/2019ADEFR
DetailsJim Storey
Courtesy inspection for mezzanine walls // Mike Phone #: ###-#### out of time
BLD-Energy code compliance1/22/20191/22/20191/22/2019PPASS
DetailsJim Storey
Mike Phone #: ###-#### ele rm ok to cover
BLD-Framing/Rough-in1/17/20191/17/20191/17/2019PPASS
DetailsJim Storey
Michael Phone #: ###-#### east end of ele rm ok to cover.
BLD-Conference1/14/20191/16/20191/16/2019PPASS
DetailsJim Storey
Mike Phone #: ###-####
BLD-Grading Inspection1/10/20191/11/20191/11/2019ANR
DetailsJim Storey
Michael Pearson On Site Superintendent Phone #: ###-#### Inspection requested via web by Larry Monkarsh
BLD-Energy code compliance1/10/20191/11/20191/11/2019ANR
DetailsJim Storey
Michael Pearson On Site Superintendent Phone #: ###-#### Inspection requested via web by Larry Monkarsh
BLD-Framing/Rough-in12/26/201812/26/201812/26/2018PPART
DetailsJim Storey
Mike Phone #: ###-#### need ti number// backing for ada// all trades signed off.
BLD-Wall Bracing12/3/201812/3/201812/3/2018PPASS
DetailsJim Storey
Bryce Phone #: ###-####
BLD-Framing/Rough-in11/27/201811/27/201811/27/2018PPASS
DetailsJim Storey
Bruce Phone #: ###-#### ele room ok/ east demizing wall ok
BLD-Framing/Rough-in11/14/201811/15/201811/15/2018APASS
DetailsJim Storey
Brice Phone #: ###-#### exterior roofs at vestables ok to cover
BLD-Other10/18/201810/18/201810/23/2018PPASS
DetailsJim Storey
Bryce-roof deck-2nd half Phone #: ###-#### si
BLD-Framing/Rough-in10/12/201810/15/201810/15/2018APASS
DetailsJim Storey
Bryce-decking on a reroof Phone #: ###-#### si passed for decking/ need verifacation of 2 inch poly iso to meet 11.6 r
BLD-Other8/22/20188/27/20188/27/2018PPART
DetailsJim Storey
rebar insp // Bryce Phone #: ###-#### placed w s/i
BLD-Other8/22/20188/24/20188/24/2018PPASS
DetailsJim Storey
rebar insp // Bryce Phone #: ###-#### si on site
BLD-Foundation8/14/20188/15/20188/15/2018PPASS
DetailsJim Storey
rebar // Bryce Phone #: ###-#### rebar ok pending si reports
BLD-Concrete8/6/20188/8/20188/8/2018PPASS
DetailsJim Storey
please call ahead // Bryce Phone #: ###-#### pending si report
BLD-Foundation7/26/20187/31/20188/1/2018PPART
DetailsJim Storey
Bryce-rebar Phone #: ###-#### pending si report
BLD-Concrete7/23/20187/25/20187/25/2018PPART
DetailsJim Storey
rebar- Bryce Phone #: ###-#### wip ok pending si report
BLD-Concrete7/23/20187/23/20187/23/2018APASS
DetailsJim Storey
si pannels as noted on site
BLD-Footing7/13/20187/16/20187/16/2018PPASS
DetailsJim Storey
Carl Phone #: ###-#### north east ft ok ufer ground in place ok/ pannels wip
BLD-Other6/8/20186/11/20186/11/2018PPASS
DetailsJim Storey
vipor bearer- Carl Phone #: ###-#### south end slab on grade ok to cover
BLD-Foundation5/29/20185/30/20185/30/2018PPASS
DetailsJim Storey
rebar // Carl Phone #: ###-#### north slab ok
BLD-Other5/23/20185/24/20185/24/2018ADEFR
DetailsJim Storey
Carl -for conduits underneath the footing Phone #: ###-#### need ele permit and ele insp.
BLD-Footing5/22/20185/23/20185/23/2018APASS
DetailsJim Storey
Carl Phone #: ###-#### interior ft and rebar ok area a pending si reports