Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberBLD18-00884
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameB36 Cafeteria Expansion TI
Customer NumberC30616
ePlanReviewYes
Description
(MICRON EXPANSION B36 - DEMO & STRUCTURAL) (PLAN MODIFICATION TO ADD AN EXTERIOR COVERED AREA) **(Project Management- Ron Hill)** Demolition & Structural Package for the 8,900 sq ft cafeteria expansion . The main Cafeteria Expansion Project being Permitted under BLD18-00803. This permit also establishes the required egress system during the construction phase with 1/2 of the 460 occupants allowed to egress through a horizontal exit. All work per the approved plans. This building is fully fire sprinklered. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/8/20193/11/20193/11/2019APASS
DetailsJim Storey
Kevin Phone #: ###-####
DOC - Permit Finaled3/11/20193/11/20193/11/2019PPASS
DetailsJim Storey
BLD-Final1/16/20191/16/20191/16/2019PPASS
DetailsJim Storey
Please call Kevin Phone #: ###-#### Inspection requested via web by Chris Fuhrman 2nd phase of occ ok for new caffiteria use. exting ok
BLD-Final1/14/20191/15/20191/15/2019PNR
DetailsJim Storey
Please call Kevin Phone #: ###-#### Inspection requested via web by Chris Fuhrman c/n signage to indcate exits/remove debri and workers/ handrail required at srair.
FIRE-Final Inspection1/14/20191/15/20191/15/2019APART
DetailsJim Page
Life fire safety inspection for TCO of cafeteria expansion complete.

Please call Kevin Phone #: ###-#### Inspection requested via web by Chris Fuhrman
BLD-Final1/11/20191/14/20191/14/2019PNR
DetailsJim Storey
Kevin Phone #: ###-####
FIRE-Final Inspection1/11/20191/14/20191/14/2019PFAIL
DetailsJim Page
Spoke with fire alarm contractor, in duct detectors on RTU's suppling main open area are not hooked to fire panel, FIR permit for fire alarms needs to be finaled before life fire safety inspection.

Kevin Phone #: ###-####
BLD-Ceiling Grid Inspection1/11/20191/11/20191/11/2019PPASS
DetailsJim Storey
Kevin Phone #: ###-#### ceilling in kitchen ok exit path being maintaned.
BLD-Framing/Rough-in1/10/20191/10/20191/10/2019PPASS
DetailsJim Storey
Please call Kevin; Firewall Phone #: ###-#### Inspection requested via web by Chris Fuhrman south 2 hr wall complet ok to cover.
BLD-Framing/Rough-in1/7/20191/8/20191/8/2019PPART
DetailsJim Storey
Kevin Phone #: ###-#### 3/4 height of core borad installed with ch studs// need stager of core board aprox 15 to 16 ft.
BLD-Wall Bracing12/17/201812/18/201812/18/2018APASS
DetailsMike Jordan
Kevin-interior wall inspection Phone #: ###-####. Interior steel stud framed walls ok.
BLD-Energy code compliance12/10/201812/10/201812/10/2018PPASS
DetailsMike Jordan
Kevin Phone #: ###-####. Exterior walls only ok.
BLD-Framing/Rough-in12/10/201812/10/201812/10/2018PPASS
DetailsMike Jordan
Kevin Phone #: ###-####. Soffit framing around accordian doors ok.
BLD-Energy code compliance12/7/201812/10/201812/10/2018ANR
DetailsMike Jordan
Kevin Phone #: ###-####. Moved to pm inspection.
BLD-Framing/Rough-in11/15/201811/15/201811/15/2018PPASS
DetailsJim Storey
Kevin Phone #: ###-#### exterior walls north stair need 2hr assembly
BLD-Foundation8/31/20189/4/20189/4/2018APASS
DetailsJim Storey
Kevin Phone #: ###-#### walls ok / south ft/ ok with foam wrap around duct bank per engineer.
BLD-Foundation8/23/20188/28/20188/28/2018APART
DetailsJim Storey
rebar- Kevin Phone #: ###-#### south ft si to insp. corect bar to grade clearances
BLD-Foundation8/1/20188/1/20188/1/2018PPASS
DetailsJim Storey
Kevin Phone #: ###-#### rebar ok pending si report
BLD-Footing7/25/20187/26/20187/26/2018PPASS
DetailsJim Storey
Kevin Phone #: ###-####
BLD-Foundation7/18/20187/18/20187/18/2018PPASS
DetailsJim Storey
Kevin Phone #: ###-#### center sec wall rebar ok
BLD-Foundation7/12/20187/13/20187/13/2018APASS
DetailsJim Storey
Kevin Phone #: ###-#### north sec
BLD-Footing7/11/20187/11/20187/11/2018PPART
DetailsJim Storey
Kevin Phone #: ###-#### revise reinforced concrete footing detail above & adjacent to the 24in storm drain line to support & transfer the load from the building column above the pipe insp performed with si pending report
BLD-Foundation6/29/20187/2/20187/2/2018APART
DetailsDave Hannah
Kevin--late morning preferred, concrete at 12, special inspector on site Phone #: ###-#### 24 inch storm drain is rapped with 4inchs of foam ok to back fill spec inspection will finish rebar inspection.
BLD-Footing6/21/20186/22/20186/22/2018AFAIL
DetailsJim Storey
Kevin Phone #: ###-#### col direct on top of large pipe not allowed per plan resubmit to city// north rebar less than 3 inches to grade//flood ft sillt need conpaction re tested or aproved by engineer.