BLD-Aging Inspection | 4/17/2020 | 4/17/2020 | 4/23/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 4/16/2020 | 4/16/2020 | 4/22/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Foundation | 12/3/2019 | 12/3/2019 | 12/4/2019 | P | PART |
Tony Young
|
|
|
Edgar Phone #: ###-####,, walls for planter ok,, work in progress
|
BLD-Footing | 11/25/2019 | 11/25/2019 | 11/25/2019 | P | PASS |
Tony Young
|
|
|
edgar Phone #: ###-####,, planter/ retaining wall footings ok
|
BLD-Blower Door Test Results | 9/17/2019 | 9/18/2019 | 9/18/2019 | P | DONE |
Tony Young
|
|
|
Please call chris when you are on your way. Thank you! Phone #: ###-#### Inspection requested via web by Clayton Conner/// 1.9
|
DOC - Permit Finaled | 9/18/2019 | 9/18/2019 | 9/18/2019 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 9/17/2019 | 9/18/2019 | 9/18/2019 | P | PASS |
Tony Young
|
|
|
Please call chris when you are on your way. Thank you! Phone #: ###-#### Inspection requested via web by Clayton Conner// glazing by front door is one piece per contractor/ window rep and has acid etch on bottom.. ok
|
BLD-Final | 9/17/2019 | 9/17/2019 | 9/17/2019 | A | PEND |
Tony Young
|
|
|
Please call chris when you are on your way. Thank you! Phone #: ###-#### Inspection requested via web by Clayton Conner// corrections made ok except need to verify the tempered glass is in one plane or divided up.. in which all panes w/in 24" of the front door would need to be temperd
|
BLD-Final | 9/12/2019 | 9/13/2019 | 9/13/2019 | A | FAIL |
Jim Storey
|
|
|
Chris and clay are in and out of cell service. Please call tucker at ###-#### for approved set of plans. Phone #: ###-#### Inspection requested via web by Clayton Conner// c/n posted saftey glazing at entry/ landing at grage passage exterior/ egress window well fill or ladder basment.
|
BLD-Conference | 9/5/2019 | 9/5/2019 | 9/5/2019 | P | PART |
Tony Young
|
|
|
Please call Chris when you are on your way. Phone #: ###-#### Inspection requested via web by Clayton Conner,, ok to move items into basement area
|
BLD-Aging Inspection | 6/27/2019 | 6/27/2019 | 6/27/2019 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 6/26/2019 | 6/26/2019 | 6/27/2019 | | PASS |
Tony Young
|
|
|
|
BLD-Energy code compliance | 2/12/2019 | 2/12/2019 | 2/12/2019 | P | PASS |
Tony Young
|
|
|
Insulation Inspection. thank you! Phone #: ###-#### Inspection requested via web by Clayton Conner
|
BLD-Framing/Rough-in | 2/11/2019 | 2/12/2019 | 2/12/2019 | A | PASS |
Tony Young
|
|
|
Sheetrock Overhang Inspection Phone #: ###-#### Inspection requested via web by Clayton Conner,, soffits ok
|
BLD-Framing/Rough-in | 1/22/2019 | 1/23/2019 | 1/23/2019 | A | PASS |
Brandon Shaw
|
|
|
OK to insulate
|
BLD-Energy code compliance | 1/22/2019 | 1/22/2019 | 1/22/2019 | P | DEFR |
Dave Hannah
|
|
|
Caulk and seal and framing inspection. Please call before hand as permit plans are in the trailer. Thank you, Clayton Phone #: ###-#### Inspection requested via web by Clayton Conner out of time
|
BLD-Wall Bracing | 12/10/2018 | 12/10/2018 | 12/10/2018 | A | DONE |
Tony Young
|
|
|
Finishing up the shear inspection. Phone #: ###-#### Inspection requested via web by Clayton Conner,, exterior done
|
BLD-Wall Bracing | 11/28/2018 | 11/28/2018 | 11/28/2018 | P | PART |
Tony Young
|
|
|
Partial Shear Wall Inspection Phone #: ###-#### Inspection requested via web by Clayton Conner,, exterior ok after minor fixes
|
BLD-Foundation | 8/8/2018 | 8/8/2018 | 8/8/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro. Foundatio and basement walls ok.
|
BLD-Footing | 8/1/2018 | 8/1/2018 | 8/1/2018 | A | PART |
Tony Young
|
|
|
As late as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro,, work in progress
|