Information based on query as of Friday, May 10, 2024.
Permit Information
Permit NumberBLD18-01190
StatusFinaled
Name BENITON CONSTRUCTION
Site Address 13255 W MCMILLAN RD
Project NamePioneer Elementary Gymnasium
Customer Number 
ePlanReviewYes
Description
(PIONEER ELEMENTARY – GYMNASIUM) // 10-1-18 PLAN MOD TO USE SPRAYED APPLIED FIREPROOFING MATERIAL FOR 1-HOUR RATING AT COLUMNS PER G1.01. SPECIAL INSPECTION REQUIRED. JAR // **Permit to construct a new 8,926 square foot addition with gymnasium, 2 classrooms and associated support areas including restrooms, office, storage, and mechanical rooms on the existing Pioneer Elementary School campus. Work also includes general site work. Special inspections required per attached Form 310. All work per the approved plans and notations. This building is fully fire sprinklered for area increase and is fully alarmed. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/4/20191/4/20191/4/2019PPASS
DetailsJim Sly
Request for Final Occupancy. The last piece of panic hardware is currently being installed and should be complete by 2pm. Please call Dan with any concerns. Phone #: ###-#### Inspection requested via web by Dan Koski
OK for Perm. Occ.
FIRE-Final Inspection1/2/20191/2/20191/2/2019PPASS
DetailsTroy Cobbley
Life safety passed


Request for Life Safety Final inspection. Please contact Dan with any concerns. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Other1/2/20191/2/20191/2/2019PCANC
DetailsJim Sly
Life and Safety inspection request. Fire alarm final is this morning. I''m thinking that we could just do this when fire alarm is complete. Please call Dan with any concerns. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Final1/2/20191/2/20191/2/2019PPART
DetailsJim Sly
OK for Temp. Occ. OK for Perm. Occ. when Panic Hardware is installed on Select classroom Exterior Exit Door.
BLD-Conference12/19/201812/20/201812/20/2018PPASS
DetailsJim Sly
Building walk through prior to final. Please call Dan with any issues. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Conference11/28/201811/29/201811/29/2018PDEFR
DetailsMike Jordan
Request for project walk through and occupancy requirements forthcoming. Please try to stop by after 1pm due to meetings. Call Dan with any concerns. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Framing/Rough-in11/14/201811/14/201811/14/2018APASS
DetailsJim Sly
Fire walls and lid inspections for hallway, classrooms and bathrooms. Please contact Dan with any questions. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Framing/Rough-in11/5/201811/5/201811/5/2018ADONE
DetailsJim Sly
Final screw pattern inspection request on wood sheeting inside the gym. Please call Dan with any concerns. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Framing/Rough-in11/2/201811/2/201811/2/2018PPART
DetailsJim Sly
Screw pattern inspection request for the north wall of the gym. This is along grid line 5 between grids A and B. Please call Dan with any concerns. Phone #: ###-#### Inspection requested via web by Dan Koski OK
BLD-Framing/Rough-in10/30/201810/31/201810/31/2018APASS
DetailsJim Sly
Screw pattern inspection request along west wall of the gym. Please call Dan with any concerns. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Energy code compliance10/30/201810/30/201810/30/2018PPART
DetailsJim Sly
Fire lid inspection for the bathrooms, hallway, and classrooms. Please call Dan with any questions. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Framing/Rough-in10/23/201810/23/201810/23/2018APART
DetailsJim Sly
Request for wall sheeting screw pattern inspection in the gym. Please call Dan with any questions. Phone #: ###-#### Inspection requested via web by Dan Koski
12 foot section in S. E. corner.......OK.
BLD-Conference10/18/201810/18/201810/18/2018PDONE
DetailsJim Sly
Request for consult with Plumbing Contractor and Architect this afternoon. Please call Dan to confirm what time works best. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Energy code compliance10/16/201810/17/201810/17/2018APART
DetailsJim Sly
Inspection of Fire Lid request for rooms and hallway south of grid 3. Please call Dan with any questions. Phone #: ###-#### Inspection requested via web by Dan Koski
Fix ceiling penitrations built wit dissimilar materials.
BLD-Other10/4/201810/5/201810/5/2018PPASS
DetailsJim Sly
Spray applied fire proofing on columns. (grid line C between 3-5) Phone #: ###-#### Inspection requested via web by Scott Hilbert
5 columns......MTI inspected.
BLD-Other10/4/201810/5/201810/5/2018APART
DetailsJim Sly
Above ceiling fire taping. Phone #: ###-#### Inspection requested via web by Scott Hilbert
Select rooms........
BLD-Energy code compliance10/3/201810/4/201810/4/2018APART
DetailsJim Sly
Insulation and vapor barrier Phone #: ###-#### Inspection requested via web by Scott Hilbert
Select area......
BLD-Other10/3/201810/4/201810/4/2018APASS
DetailsJim Sly
Shear wall screw inspection Phone #: ###-#### Inspection requested via web by Scott Hilbert
BLD-Framing/Rough-in9/21/20189/21/20189/21/2018APART
DetailsJim Sly
Request for fire lid inspection along grid 1 between classroom entry doors 110B and 103B. This alcove is exterior fire lid. Please call Dan with any questions. Phone #: ###-####
Inspection requested via web by Dan Koski
OK
BLD-Framing/Rough-in9/20/20189/20/20189/20/2018PPART
DetailsJim Sly
Inspection of encapsulated columns requested. Columns along grid 2 and the intersection of grids 5/B are ready. Please call Dan with any concerns. Phone #: ###-#### Inspection requested via web by Dan Koski
Above items......OK.
BLD-Other9/17/20189/17/20189/17/2018PDONE
DetailsJim Sly
Air Barrier inspection request. Please call Dan with any questions. Phone #: ###-#### Inspection requested via web by Dan Koski
90 percent complete. MTI providing special inspections.
BLD-Framing/Rough-in9/6/20189/6/20189/6/2018PDONE
DetailsJim Sly
Consult request for fire ratings and column encapsulation. Please call Dan with any questions. Phone #: ###-#### Inspection requested via web by Dan Koski
Defer to Architect of record.
BLD-Framing/Rough-in9/5/20189/5/20189/5/2018PPART
DetailsJim Sly
Exterior DensGlas screw pattern inspection request. Please call Dan with questions. MTI was out yesterday looking at the same thing Phone #: ###-#### Inspection requested via web by Dan Koski
Gym Ok pending MTI special insp.and approval.
BLD-Framing/Rough-in8/22/20188/23/20188/23/2018APART
DetailsJim Sly
Request for framing inspection on Gym and Classroom exterior walls. Please call Dan with any questions. Special inspection is scheduled as well. Phone #: ###-#### Inspection requested via web by Dan Koski
Classroom and Gym Exterior walls and hold downs OK. MTI on site for welded connections.
BLD-Other7/31/20187/31/20187/31/2018PDEFR
DetailsJim Sly
Request for inspection of Seepage bed before fabric and rock install. The Land Group is scheduled to come out as well. Please call Dan with any concerns. Phone #: ###-####
Inspection requested via web by Dan Koski
Advised contr. to Call Public Works.
BLD-Framing/Rough-in7/30/20187/31/20187/31/2018APART
DetailsJim Sly
Request for install procedures, proper insulation, and overall framing request. Please call Dan with any concerns. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Other7/26/20187/27/20187/26/2018PPASS
DetailsJim Sly
Rebar and Vapor Barrier inspection request for the remainder of the building slab. This will complete our interior slab from grid lines A-D and 1-5. Please call Dan with any questions. Phone #: ###-#### Inspection requested via web by Dan Koski
OK pending MTI special inspection, tests and approvals.
BLD-Other7/26/20187/26/20187/26/2018APART
DetailsJim Sly
Masonry rebar inspection request for the trash enclosure. Grouting this at 12pm. We will have MTI on site to take samples and check rebar as well. Please call Dan with any questions. Phone #: ###-#### Inspection requested via web by Dan Koski
OK pending MTI special inspections, tests and approvals.
BLD-Concrete7/20/20187/20/20187/20/2018APART
DetailsJim Sly
Gym slab rebar and vapor barrier inspection request. The slab is scheduled to place next Monday. PM inspection is fine as well the area ready at any time. Please call Dan with any concerns. Phone #: ###-#### Inspection requested via web by Dan Koski
Slab OK pending MTI special inspection, tests and approvals.
BLD-Footing7/17/20187/17/20187/17/2018PPASS
DetailsBrandon Shaw
Rebar inspection for spread footings along grid C and grids 4;5. Trash enclosure rebar in the footing requested as well. MTI is scheduled for special inspection as well.
BLD-Foundation7/13/20187/13/20187/13/2018APASS
DetailsJim Sly
Request for inspection on the rebar in the concrete stem walls. Perimeter stem walls and gym walls being placed this afternoon. Grids 1-5 and A-D. Please call Dan with any concerns.
Phone #: ###-#### Inspection requested via web by Dan Koski
OK .....Pending MTI special inspections, tests and approvals.
BLD-Footing7/9/20187/10/20187/10/2018APASS
DetailsJim Sly
Rebar inspection request for the footing placement scheduled this afternoon. Grids A-D, and 1-5. Please call Dan with any questions. Thanks Phone #: ###-#### Inspection
requested via web by Dan Koski
OK Pending MTI special inspections, Tests and Approvals.
BLD-Conference6/25/20186/26/20186/26/2018ADONE
DetailsJim Sly
Pioneer Elementary overview and plans for the project. Please call Dan with any questions. Phone #: ###-#### Inspection requested via web by Dan Koski