Information based on query as of Sunday, May 12, 2024.
Permit Information
Permit NumberBLD18-01401
StatusFinaled
Name LM CONSTRUCTION CO LLC
Site Address 8485 S FEDERAL WAY Unit: 110
Project NameTeffco Office TI Suite 110
Customer Number 
ePlanReviewYes
Description
(TEFFCO OFFICE - SUITE 110) // 10-01-18 PLAN MOD TO ADD CEILING FRAMING FOR ACT GRID. JAR // **Permit to build a 2,950 sq ft office space in a new 117,432 sq. ft. shell office/warehouse building constructed under BLD18-00596. Note: site work, envelope and exterior lighting were approved with the shell permit. Work to include: non-bearing interior walls; electrical including interior lighting; mechanical roof top units and ducting; plumbing including kitchen and restrooms; and interior finishes in compliance with Chapter 8 of the 2015 IBC. Occupancy is only permitted in the 2,950 sq ft office area; no occupancy is allowed in the remainder of the building. This building will be fully Fire Sprinklered for unlimited area with an approved Fire Alarm system. The Fire Sprinkler and Fire Alarm systems WILL REQUIRE SEPARATE PERMITS and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. No occupancy is permitted until fire sprinkler system and fire alarm systems are installed. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/31/20191/31/20191/31/2019PPASS
DetailsJim Storey
Michael Phone #: ###-#### final ok pending plm
FIRE-Final Inspection1/30/20191/31/20191/31/2019PPASS
DetailsJim Page
Final life fire safety inspection for office TI space complete.

Michael Phone #: ###-####
BLD-Final1/30/20191/31/20191/31/2019ADEFR
DetailsJim Storey
Michael Phone #: ###-#### to pm
BLD-Conference1/30/20191/30/20191/30/2019PPASS
DetailsJim Storey
Mike Phone #: ###-####
FIRE-Final Inspection1/29/20191/30/20191/30/2019PCANC
DetailsJim Page
Michael Phone #: ###-####-1-30-19 Mike called and cancelled
BLD-Conference1/14/20191/16/20191/16/2019PPASS
DetailsJim Storey
Mike Phone #: ###-####
BLD-Energy code compliance1/9/20191/10/20191/10/2019PPASS
DetailsJim Storey
Mike or ###-#### Phone #: ###-####
BLD-Other1/9/20191/10/20191/10/2019APASS
DetailsJim Storey
Mike or ###-#### Screw inspection for drywall Phone #: ###-####
BLD-Framing/Rough-in1/2/20191/4/20191/4/2019APASS
DetailsJim Storey
Mike Phone #: ###-#### ok to cover upon plm pass// backing instaled.