Permit Information
Permit NumberBLD18-01423
StatusFinaled
Name MJT CONSTRUCTION INC
Site Address 909 E PARKCENTER BLVD
Project NameAlbertsons
Customer Number 
ePlanReviewYes
Description
(ALBERTSONS - INTERIOR REMODEL) //Plan Modification #2 to revise the location of floor sinks in the Starbucks kiosk and plumbing work. 8-3-2018 JG// - //Plan modification #1 to add online order pick-up area at north/east entry vestibule and add an exterior 4’ CMU wall with storefront system above under existing canopy. 6-6-2018 JG// Permit to remodel an existing 50,724 sq. ft. retail grocery store. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select cooler doors and replace with new cooler doors, removal of select interior nonbearing walls, removal of select door/door frame, removal of select millwork, construction of interior non-bearing walls to create a smaller cash room and a Starbucks storage area, a new Starbucks kiosk and associated equipment, select new door/door frame, relocated and or new display cases and refrigerated cases, (6) new checkstands, select new millwork, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/13/201811/14/201811/14/2018APASS
DetailsBrandon Shaw
Please call ahead ###-#### the plans for this project are located in the drive up and go space left hand side of the store at the entry.

thanks
Mike Teeter Phone #: ###-#### Inspection requested via web by Mike Teeter
DOC - Permit Finaled11/14/201811/14/201811/14/2018PPASS
DetailsBrandon Shaw
FIRE-Final Inspection11/9/201811/13/201811/13/2018APASS
DetailsTroy Cobbley
Life safety passed. The thumbturn deadbolt on the Pick and Go room needs removed prior to a building inspection as per our conversation

please give me a call ahead of time ###-#### thanks Mike Teeter Inspection requested via web by Mike Teeter
FIRE-Final Inspection7/26/20187/27/20187/27/2018APART
DetailsTroy Cobbley
The Star Bucks is being given a temp with Ron's permission until a fire alarm permit is issued/inspected for the over spaced ceiling mounted 30cd horn/strobe in this space. No other areas inspected.

Phone #: ###-#### Inspection requested via web by Mike Teeter
BLD-Other7/25/20187/26/20187/26/2018APART
DetailsJim Storey
I would like to schedule a occupancy inspection for the new Starbucks Kiosk for early morning please. this is just to make sure the inspector is ok with opening the Kiosk. Please call with any questions. Mike Teeter ###-#### Phone #: ###-#### Inspection requested via web by Mike Teeter/ need wire ties 3wraps in 1 inch clips at perimitor
BLD-Wall cover7/11/20187/12/20187/12/2018APASS
DetailsJim Storey
looking for a rough inspection for Albertsons Park Center to cover Phone #: ###-#### Inspection requested via web by Mike Teeter ok pending trade aprovals
BLD-Framing/Rough-in7/11/20187/12/20187/12/2018APART
DetailsJim Storey
looking for a rough inspection for Albertsons Park Center to cover Phone #: ###-#### Inspection requested via web by Mike Teeter ok pending trade aprovals