BLD-Final | 11/13/2018 | 11/14/2018 | 11/14/2018 | A | PASS |
Brandon Shaw
|
|
|
Please call ahead ###-#### the plans for this project are located in the drive up and go space left hand side of the store at the entry.
thanks Mike Teeter Phone #: ###-#### Inspection requested via web by Mike Teeter
|
DOC - Permit Finaled | 11/14/2018 | 11/14/2018 | 11/14/2018 | P | PASS |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 11/9/2018 | 11/13/2018 | 11/13/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. The thumbturn deadbolt on the Pick and Go room needs removed prior to a building inspection as per our conversation
please give me a call ahead of time ###-#### thanks Mike Teeter Inspection requested via web by Mike Teeter
|
FIRE-Final Inspection | 7/26/2018 | 7/27/2018 | 7/27/2018 | A | PART |
Troy Cobbley
|
|
|
The Star Bucks is being given a temp with Ron's permission until a fire alarm permit is issued/inspected for the over spaced ceiling mounted 30cd horn/strobe in this space. No other areas inspected.
Phone #: ###-#### Inspection requested via web by Mike Teeter
|
BLD-Other | 7/25/2018 | 7/26/2018 | 7/26/2018 | A | PART |
Jim Storey
|
|
|
I would like to schedule a occupancy inspection for the new Starbucks Kiosk for early morning please. this is just to make sure the inspector is ok with opening the Kiosk. Please call with any questions. Mike Teeter ###-#### Phone #: ###-#### Inspection requested via web by Mike Teeter/ need wire ties 3wraps in 1 inch clips at perimitor
|
BLD-Wall cover | 7/11/2018 | 7/12/2018 | 7/12/2018 | A | PASS |
Jim Storey
|
|
|
looking for a rough inspection for Albertsons Park Center to cover Phone #: ###-#### Inspection requested via web by Mike Teeter ok pending trade aprovals
|
BLD-Framing/Rough-in | 7/11/2018 | 7/12/2018 | 7/12/2018 | A | PART |
Jim Storey
|
|
|
looking for a rough inspection for Albertsons Park Center to cover Phone #: ###-#### Inspection requested via web by Mike Teeter ok pending trade aprovals
|