Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberBLD18-01465
StatusFinaled
Name ANDY THOMPSON CONSTRUCTION INC
Site Address 7920 W MAXWELL DR
Project Namepo # 3800, 7920 Maxwell
Customer Number 
ePlanReviewYes
Description
***Prescriptive component energy approach*** Permit for the construction of a new 1995 sq. ft., two story (first story 1362 sq. ft., second story 633 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 74 sq. ft. of covered patio/porch and a 419 sq. ft. attached garage per the approved plans and any notations. R1C zoning and setbacks per planning. MDH
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/4/20189/4/20189/4/2018PPASS
DetailsMike Jordan
garage code 7920 Phone #: ###-#### Inspection requested via web by Andy Thompson
DOC - Permit Finaled9/4/20189/4/20189/4/2018PPASS
DetailsMike Jordan
BLD-Blower Door Test Results9/4/20189/4/20189/4/2018PDONE
DetailsMike Jordan
4.89ACH @50pa
BLD-Energy code compliance7/13/20187/13/20187/13/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Andy Thompson
BLD-Framing/Rough-in7/13/20187/13/20187/13/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Andy Thompson
BLD-Framing/Rough-in7/11/20187/12/20187/12/2018AFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Andy Thompson. Complete lateral bracing on A3 and B1 trusses. Fireblock fur dowm in masterbedroom and mech chases upstairs. Provide attic access in livingroom/bedroom and aditional access in garage. Finish nailing off 3ply B2 attic truss. Correction notice posted.
BLD-Framing/Rough-in7/11/20187/11/20187/11/2018PCANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Andy Thompson Inspection cancelled from web by: Andy Thompson
BLD-Wall Bracing6/26/20186/26/20186/26/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Andy Thompson
BLD-Wall cover6/22/20186/25/20186/25/2018AFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Andy Thompson. Provide the portal frame at arched window as shown on approved plans, complete 2nd. floor.
BLD-Footing5/24/20185/24/20185/24/2018PPASS
DetailsMike Jordan
Andy- Matt Phone #: ###-####