Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberBLD18-01669
StatusFinaled
Name PERRYMAN CONSTRUCTION MANAGEMENT IN
Site Address 1290 N MOUNT HOOD AVE
Project NameL6 B1 Cottages at White Clouds
Customer NumberEPLAN BLD18-01668
ePlanReview 
Description
(TWO PERMITS UNDER BLD18-01668)Permit for the construction of a new 1,277 sq. ft., two story (first story 508 sq. ft., second story 769 sq. ft.) single family dwelling with 3 bedrooms, 2 and a half bathrooms, approximately 0 sq. ft. of covered patio/porch and a 412 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/7/20192/7/20192/7/2019PPASS
DetailsBrandon Shaw
Corrections SAT...
DOC - Permit Finaled2/7/20192/7/20192/7/2019PPASS
DetailsBrandon Shaw
BLD-Final2/5/20192/5/20192/5/2019PFAIL
DetailsMike Jordan
Scott Phone #: ###-####. Habdrail mounted to high. Correct the adress.
BLD-Energy code compliance11/28/201811/28/201811/28/2018PPASS
DetailsMike Jordan
mateo Phone #: ###-####
BLD-Framing/Rough-in11/21/201811/21/201811/21/2018APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Framing/Rough-in11/9/201811/9/201811/9/2018PFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown. Provide additional studs under the 13/4 X18 LVL. Nail off 2 ply C02 truss upstairs and add additional studs and h2.5. Complete 2hr. assembly at soffits. Install break away clips. Tempered glazing required at window by shower upstairs.
BLD-Framing/Rough-in11/7/201811/7/201811/7/2018PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Wall Bracing10/23/201810/23/201810/23/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Concrete9/19/20189/19/20189/19/2018PPASS
DetailsMike Jordan
Thickened footings Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Energy code compliance9/19/20189/19/20189/19/2018PPASS
DetailsMike Jordan
Foundation insulation Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Energy code compliance9/6/20189/6/20189/6/2018PPART
DetailsBrandon Shaw
Foundation insulation
BLD-Energy code compliance9/4/20189/4/20189/4/2018ANR
DetailsMike Jordan
Foundation Insulation Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Foundation8/27/20188/28/20188/28/2018PPASS
DetailsMike Jordan
foundation // Dane Phone #: ###-####
BLD-Footing8/27/20188/27/20188/27/2018PPART
DetailsMike Jordan
Latest as possible - Wes Phone #: ###-####