Information based on query as of Monday, May 13, 2024.
Permit Information
Permit NumberBLD18-01933
StatusFinaled
Name CLINTON J SMITH
Site Address 901 N 15TH ST
Project NameBoise Buddhist Community Cente
Customer Number 
ePlanReviewYes
Description
(BOISE BUDDHIST COMMUNITY CENTER – EAST END OF BUILDING) (DRH17-00487) (CUP17-00069) (CVA17-00063) This building does not have a fire sprinkler system. To expand a former residential apartment by about 146 square feet into and adjacent residential apartment and to convert the expanded tenant space to a meditation center. After the expansion, the meditation center will have a total floor area of about 653 square feet and the adjacent residential apartment will be reduced in size from about 504 square feet to about 358 square feet. The apartment is not required to comply as a Type A or as a Type B dwelling unit since there are less than 4 dwelling units in this building. Work is to include an exterior wood ramp accessible to the disabled, a 2-hr fire barrier wall to function as a dwelling unit separation to entirely separate the meditation center tenant space and the area below it from the rest of the building, a toilet room accessible to the disabled, interior nonbearing walls, and finishes. Structural work includes a concrete footing in the existing crawlspace, new beams sistered to the side of existing floor beams, wood columns, and a new roof beam with new columns. Special Inspection is required for anchors post-installed in hardened concrete. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. A separate permit (i.e. Occupancy Approval Review) is required to establish occupancy for the remodeled dwelling unit. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/31/201812/31/201812/31/2018PPASS
DetailsDave Hannah
BLD-Conference12/28/201812/28/201812/31/2018PPASS
DetailsDave Hannah
Clinton Phone #: ###-####
BLD-Final11/19/201811/20/201811/20/2018APEND
DetailsDave Hannah
Clinton Phone #: ###-#### ok for temp occ needs to add handrail on aprt and returns on handrails on front steps and ramp
FIRE-Final Inspection11/19/201811/19/201811/19/2018PPASS
DetailsJim Page
Previously noted items have been corrected, final life fire safety inspection complete.

Clinton Phone #: ###-####
FIRE-Final Inspection11/15/201811/16/201811/16/2018AFAIL
DetailsJim Page
Thumbturn deadbolt on ramp door needs to be changed to a double-key deadbolt with signage placed at door reading "Door to remain unlocked while building is occupied. Install code compliant door hardware on the two interior doors in common space on northside of building.

Clinton Phone #: ###-####
BLD-Framing/Rough-in9/21/20189/21/20189/21/2018PPASS
DetailsDave Hannah
Chris Phone #: ###-####
BLD-Framing/Rough-in9/10/20189/11/20189/11/2018APART
DetailsDave Hannah
interior framing - Chris Phone #: ###-#### ok to cover one side of four int walls
BLD-Framing/Rough-in9/5/20189/5/20189/5/2018PNR
DetailsTony Young
Chris Phone #: ###-####,, needs trades 1st
BLD-Footing8/24/20188/24/20188/24/2018PPASS
DetailsDave Hannah
rebar // Chris Phone #: ###-#### ftg in crawl space ok
BLD-Conference8/17/20188/20/20188/20/2018APART
DetailsTony Young
Chris Phone #: ###-####,, general ?s on frame, firewalls, and ADA ramp vs. property line