BLD-Final | 12/31/2018 | 12/31/2018 | 12/31/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 12/28/2018 | 12/28/2018 | 12/31/2018 | P | PASS |
Dave Hannah
|
|
|
Clinton Phone #: ###-####
|
BLD-Final | 11/19/2018 | 11/20/2018 | 11/20/2018 | A | PEND |
Dave Hannah
|
|
|
Clinton Phone #: ###-#### ok for temp occ needs to add handrail on aprt and returns on handrails on front steps and ramp
|
FIRE-Final Inspection | 11/19/2018 | 11/19/2018 | 11/19/2018 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final life fire safety inspection complete.
Clinton Phone #: ###-####
|
FIRE-Final Inspection | 11/15/2018 | 11/16/2018 | 11/16/2018 | A | FAIL |
Jim Page
|
|
|
Thumbturn deadbolt on ramp door needs to be changed to a double-key deadbolt with signage placed at door reading "Door to remain unlocked while building is occupied. Install code compliant door hardware on the two interior doors in common space on northside of building.
Clinton Phone #: ###-####
|
BLD-Framing/Rough-in | 9/21/2018 | 9/21/2018 | 9/21/2018 | P | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
BLD-Framing/Rough-in | 9/10/2018 | 9/11/2018 | 9/11/2018 | A | PART |
Dave Hannah
|
|
|
interior framing - Chris Phone #: ###-#### ok to cover one side of four int walls
|
BLD-Framing/Rough-in | 9/5/2018 | 9/5/2018 | 9/5/2018 | P | NR |
Tony Young
|
|
|
Chris Phone #: ###-####,, needs trades 1st
|
BLD-Footing | 8/24/2018 | 8/24/2018 | 8/24/2018 | P | PASS |
Dave Hannah
|
|
|
rebar // Chris Phone #: ###-#### ftg in crawl space ok
|
BLD-Conference | 8/17/2018 | 8/20/2018 | 8/20/2018 | A | PART |
Tony Young
|
|
|
Chris Phone #: ###-####,, general ?s on frame, firewalls, and ADA ramp vs. property line
|