BLD-Final | 12/17/2018 | 12/17/2018 | 12/17/2018 | P | PASS |
Jim Sly
|
|
|
Adam Phone #: ###-#### Blower Door 3.55
|
DOC - Permit Finaled | 12/17/2018 | 12/17/2018 | 12/17/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 10/5/2018 | 10/5/2018 | 10/5/2018 | P | PASS |
Jim Storey
|
|
|
Adam-energy signed off yesterday but frame was not-can you email Adam the results Phone #: ###-####
|
BLD-Energy code compliance | 10/4/2018 | 10/4/2018 | 10/4/2018 | P | PASS |
Brandon Shaw
|
|
|
Correction SAT...
|
BLD-Framing/Rough-in | 9/20/2018 | 9/21/2018 | 9/21/2018 | P | PART |
Jim Storey
|
|
|
adam Phone #: ###-#### blk and nail hangers to box 1 girder// b1 and b2 missing center bearing point/ ok to insulate// sheer ok
|
BLD-Wall Bracing | 8/24/2018 | 8/27/2018 | 8/27/2018 | P | PASS |
Jim Storey
|
|
|
Adam Phone #: ###-####
|
BLD-Foundation | 7/18/2018 | 7/19/2018 | 7/19/2018 | P | NR |
Jim Storey
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell wip
|
BLD-Footing | 7/17/2018 | 7/18/2018 | 7/18/2018 | A | PASS |
Jim Storey
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|