Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD18-02427
StatusFinaled
Name WESTMINSTER II
Site Address 4420 W EMERALD ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 2280 sq. ft., two story (first story 1176 sq. ft., second story 1104 sq. ft.) single family dwelling with 5 bedrooms, 4.5 bathrooms, approximately 98 sq. ft. of covered patio/porch and a 528 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. C-2D zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Blower Door Test Results11/20/201911/20/201911/20/2019PDONE
DetailsTell Riley
4.01 ACH 50
BLD-Final11/19/201911/20/201911/20/2019APASS
DetailsTell Riley
Gorge Phone #: ###-####//corrections made//
DOC - Permit Finaled11/20/201911/20/201911/20/2019PPASS
DetailsTell Riley
BLD-Final11/12/201911/13/201911/13/2019AFAIL
DetailsTell Riley
George Phone #: ###-####//still need fall prevention devices on windows in master bedroom//ACH is still not posted//
BLD-Final10/21/201910/22/201910/22/2019AFAIL
DetailsTell Riley
George Phone #: ###-####//need blower door test results posted// need child fall prevention devices on two windows in master--under 24" sill height//fix vapor barrier in crawl//
BLD-Final10/10/201910/11/201910/11/2019AFAIL
DetailsTell Riley
George Phone #: ###-####//still needs mechanical final prior to final inspection//left correction notice with owner onsite//
BLD-Final9/5/20199/6/20199/6/2019ANH
DetailsTell Riley
Gorge Phone #: ###-####//doors are all locked//no access to house for inspection//
BLD-Final8/5/20198/5/20198/5/2019PNR
DetailsTell Riley
Charlie Phone #: ###-####//needs plumbing, electrical and mechanical finals//left message with contact and sent text message//
BLD-Framing/Rough-in6/3/20196/3/20196/3/2019PDONE
DetailsDave Hannah
george Phone #: ###-####
BLD-Framing/Rough-in5/28/20195/28/20195/29/2019PPASS
DetailsDave Hannah
garage // george Phone #: ###-####
BLD-Footing3/25/20193/26/20193/26/2019APART
DetailsJim Sly
Charlie Phone #: ###-####
Garage footing...OK.
BLD-Energy code compliance2/22/20192/22/20192/22/2019PPASS
DetailsJim Sly
George Phone #: ###-####
BLD-Framing/Rough-in2/21/20192/21/20192/21/2019PPASS
DetailsJim Sly
George Phone #: ###-####
BLD-Framing/Rough-in2/4/20192/4/20192/4/2019PFAIL
DetailsJim Sly
George Phone #: ###-####
Need approved plans...... install hold downs per approved plan....insulate all piping...........Do Not Insulate.
BLD-Wall Bracing12/26/201812/27/201812/27/2018APASS
DetailsBrandon Shaw
All hold downs to be installed before framing rough-in...
Work in progress
BLD-Footing10/8/201810/8/201810/8/2018PPASS
DetailsBrandon Shaw
Work in progress