Information based on query as of Thursday, May 16, 2024.
Permit Information
Permit NumberBLD18-02579
StatusFinaled
Name JORDAN WILCOMB CONSTRUCTION
Site Address 7552 W VICTORY RD
Project NameIsostore, INC
Customer Number 
ePlanReviewYes
Description
(ISOSTORE, INC - VICTORY BUILDING) The fire sprinkler system is used for building area increase and for fire area. Permit is to construct tenant improvements within a new 21,885 sq. ft. building shell (Shell under BLD17-00763) to make a 2,800 sq. ft. tenant space for office and fabrication use (220 sq. ft. office area + 2,322 sq. ft. fabrication area). Approval is contingent upon adhering to the approved plans on file. Work to include: construction of interior non-bearing walls to make an open office, an accessible restroom, a production area and a 1-hour rated finishing room, select new door/door frames, new gypsum ceiling, light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. Note: Spray booth and dust collection system are future items and not part of this permit, tenant shall apply for permit when these items are to be installed. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/13/201811/13/201811/13/2018PPASS
DetailsMike Jordan
Please call 45 minutes before arrival, thank you.
Tony Dondero ###-#### Phone #: ###-#### Inspection requested via web by Tony Dondero. All issues resolved.
BLD-Final11/1/201811/1/201811/1/2018PPART
DetailsMike Jordan
please call 45 minutes before arrival. Thank you,
Tony Dondero Phone #: ###-#### Inspection requested via web by Tony Dondero. Ok for temp. occ. Needs to provide 1 hr door assembly at future paint booth.
BLD-Final10/31/201811/1/201811/1/2018ACANC
DetailsMike Jordan
please call 45 minutes before arrival. Thank you,
Tony Dondero Phone #: ###-#### Inspection requested via web by Tony Dondero
FIRE-Final Inspection10/31/201811/1/201811/1/2018PPASS
DetailsTroy Cobbley
Life safety passed. Per Jeff at TVFP the head infront of the unit heat will be changed to a high temp. today.

Please call 45 minutes before arrival. Thank you.
Tony Dondero Phone #: ###-#### Inspection requested via web by Tony Dondero
BLD-Framing/Rough-in9/17/20189/18/20189/18/2018APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Colyn Levandoske. Interior steel stud framed walls and hardlids ok.