Information based on query as of Wednesday, May 8, 2024.
Permit Information
Permit NumberBLD18-02665
StatusFinaled
Name ST LUKES HEALTH SYSTEM LTD
Site Address 720 E PARK BLVD Unit: 100
Project NameSt. Lukes WGCP - Suite #100
Customer Number 
ePlanReviewYes
Description
(ST. LUKES WGCP – REAL ESTATE OFFICE - 1st FLOOR SUITE #100) The fire sprinkler system is used for unlimited area of the building. Permit is to remodel an existing 3,246 sq. ft. business space on the 1st floor within the existing building. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select operable panels, removal of select door/door frames, removal of select millwork, removal of select suspended acoustic and gypsum ceiling, removal of select ceiling soffit, construction of select interior nonbearing walls to make (3) offices, (2) consult rooms, a reception area, a conference room, open office area, open break/work area, an access control open office area, a security office and an IT room, select wall infill, select new door/door frames, new suspended acoustic ceiling, new light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/14/201812/17/201812/17/2018APASS
DetailsDave Hannah
Zach Phone #: ###-####
BLD-Final11/7/201811/9/201811/9/2018APART
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by rocky donica ok for temp occ needs to fix front door
FIRE-Final Inspection11/7/201811/9/201811/9/2018APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.

Phone #: ###-#### Inspection requested via web by rocky donica
FIRE-Final Inspection11/6/201811/7/201811/7/2018ACANC
DetailsTroy Cobbley
Phone #: ###-#### >> Inspection requested via web by rocky donica Inspection cancelled from web by: rocky donica
BLD-Final11/6/201811/7/201811/7/2018ACANC
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by rocky donica Inspection cancelled from web by: rocky donica
BLD-Ceiling Grid Inspection10/17/201810/17/201810/17/2018PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by rocky donica
BLD-Framing/Rough-in9/6/20189/7/20189/7/2018APASS
DetailsBrandon Shaw
OK to cover