Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD18-02693
StatusFinaled
Name SEIDL HOME COMPANY
Site Address 4026 N SANDPOINT WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
HILLSIDE, WUI FOOTHILLS, ZONE "A" REQUIREMENTS, CLASS "A" ROOF REQUIRED. WUI MANAGEMENT PLAN HAS BEEN DEVELOPED FOR THIS SUBDIVISION THAT PERTAINS TO THIS LOT (A PORTION OF THE DEFENSIBLE SPACE IS MAINTAINED BY THE HOA).Permit for the construction of a new 2644 sq. ft., one story single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 457sq. ft. of covered patio/porch and a 1466 sq. ft. attached garage per the approved plans and any notations. A-1 zoning and setbacks per planning. ***BJM***

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/21/20193/22/20193/22/2019APASS
DetailsTony Young
john Phone #: ###-####,, c of o issued
DOC - Permit Finaled3/22/20193/22/20193/22/2019PPASS
DetailsTony Young
BLD-Final3/15/20193/15/20193/15/2019PPEND
DetailsTony Young
Phil Phone #: ###-####
BLD-Final3/14/20193/15/20193/15/2019APART
DetailsTony Young
Phil Phone #: ###-####,, needs hillside pass,, firecaulking
BLD-Blower Door Test Results3/15/20193/15/20193/15/2019PDONE
DetailsTony Young
Phil Phone #: ###-####/// 3.98
BLD-Energy code compliance11/15/201811/16/201811/16/2018PPASS
DetailsTony Young
Phil Phone #: ###-####
BLD-Framing/Rough-in11/8/201811/9/201811/9/2018APASS
DetailsMike Jordan
Phil Phone #: ###-####
BLD-Other11/2/201811/2/201811/2/2018PPART
DetailsTony Young
sofit // Phil Phone #: ###-####,, work in progress,, ok
BLD-Wall Bracing10/18/201810/19/201810/19/2018APASS
DetailsTony Young
Phil Phone #: ###-####,, exterior ok
BLD-Wall Bracing10/17/201810/18/201810/18/2018ANR
DetailsTony Young
Phil Phone #: ###-####,, need to re-do some areas
BLD-Foundation9/17/20189/17/20189/17/2018PPASS
DetailsTony Young
Bill Phone #: ###-####
BLD-Footing9/11/20189/12/20189/12/2018PPASS
DetailsBrandon Shaw
John Phone #: ###-####