Information based on query as of Monday, May 13, 2024.
Permit Information
Permit NumberBLD18-03097
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 5849 E HOOTOWL DR
Project NameSUN VALLEY HN 60-1
Customer Number 
ePlanReviewYes
Description
***PRESCRIPTIVE COMPONENT ENERGY APPROACH***WUI ZONE A REQUIREMENTS*** Permit for the construction of a new 3191 sq. ft., one story single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 323 sq. ft. of covered patio/porch and a 824 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. MDH

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/24/20194/24/20194/24/2019PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
DOC - Permit Finaled4/24/20194/24/20194/24/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results4/24/20194/24/20194/24/2019PDONE
DetailsBrandon Shaw
ACH50- 3.89
BLD-Final3/11/20193/11/20193/11/2019PNR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Kyle Seick no public works sign off to allow final insp.
BLD-Final3/7/20193/8/20193/8/2019ANR
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Kyle Seick needs mec final first
BLD-Other1/9/20191/9/20191/9/2019PPASS
DetailsBrandon Shaw
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Energy code compliance1/2/20191/3/20191/3/2019PPASS
DetailsBrandon Shaw
Corrections SAT...
BLD-Framing/Rough-in12/31/201812/31/201812/31/2018PFAIL
DetailsBrandon Shaw
Per plans- (2) 9 1/2 LVL's required at bearing wall header, Master closet...
Break in double top plates, bearing wall, Master closet...
Need Engineering approval for A3 truss, bottom cord broken...
Truss engineering packet frozen, not able to review any pages...
BLD-Wall Bracing12/3/201812/3/201812/3/2018PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Foundation10/25/201810/25/201810/25/2018PPASS
DetailsBrandon Shaw
Work in progress
BLD-Foundation10/25/201810/25/201810/25/2018ACANC
DetailsBrandon Shaw
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
BLD-Footing10/24/201810/24/201810/24/2018PPASS
DetailsBrandon Shaw
Work in progress