BLD-Final | 12/26/2019 | 12/27/2019 | 12/27/2019 | P | PASS |
Tony Young
|
|
|
Noel Phone #: ###-####
|
BLD-Blower Door Test Results | 12/27/2019 | 12/27/2019 | 12/27/2019 | P | PASS |
Tony Young
|
|
|
Noel Phone #: ###-####.. 3.48
|
DOC - Permit Finaled | 12/27/2019 | 12/27/2019 | 12/27/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Conference | 12/20/2019 | 12/23/2019 | 12/23/2019 | A | PART |
Tony Young
|
|
|
Fabian Phone #: ###-####,, walk through on the final,, needs hillside PW pass,, needs guard rail and hand rail to meet code,, needs fire seperation in the garage..
|
BLD-Aging Inspection | 12/10/2019 | 12/10/2019 | 12/11/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Conference | 10/15/2019 | 10/16/2019 | 10/16/2019 | A | PASS |
Tony Young
|
|
|
Noel Phone #: ###-####,, stair ?s
|
BLD-Framing/Rough-in | 7/26/2019 | 7/29/2019 | 7/29/2019 | A | PART |
Tony Young
|
|
|
Chet Phone #: ###-####,, needs to seal chases,, ok to insulate
|
BLD-Framing/Rough-in | 7/25/2019 | 7/26/2019 | 7/26/2019 | P | NR |
Tony Young
|
|
|
Chet Phone #: ###-####,,conf. walk through only,, needs trades,, needs tempered glass by final,, temp stairs in now,, verify stairs at the final.. needs fire blocking of chases,, plates
|
BLD-Concrete | 3/20/2019 | 3/21/2019 | 3/21/2019 | A | PART |
Tony Young
|
|
|
Phone #: 2088616923 >> Inspection requested via mobile web by Fabian Noel,, work in progress on upper level ICF walls
|
BLD-Concrete | 3/18/2019 | 3/20/2019 | 3/20/2019 | P | NR |
Dave Hannah
|
|
|
Phone #: 2088616923 >> Inspection requested via mobile web by Fabian Noel
|
BLD-Foundation | 3/1/2019 | 3/1/2019 | 3/1/2019 | P | PART |
Tony Young
|
|
|
rebar// sabian Phone #: ###-####,, icf block wall,, mid wall ok to grout
|
BLD-Concrete | 1/14/2019 | 1/17/2019 | 1/17/2019 | A | PART |
Mike Jordan
|
|
|
Phone #: 2088806738 >> Inspection requested via mobile web by Chet Clark. ICF permiter wall from top of footing to 10ft. 8 inch elev. Needs to tie verts in place and complet lintel steel.
|
BLD-Footing | 1/8/2019 | 1/10/2019 | 1/10/2019 | A | PASS |
Brandon Shaw
|
|
|
First story footings... Work in progress...
|
BLD-Wall Bracing | 12/1/2018 | 12/5/2018 | 12/5/2018 | A | PART |
Tony Young
|
|
|
As early as possible Phone #: 2088616923 >> Inspection requested via mobile web by Fabian Noel,, upper retaining wall,, work in progress,, will tent and heat for freezing temps
|
BLD-Footing | 11/20/2018 | 11/26/2018 | 11/26/2018 | A | PART |
Tony Young
|
|
|
As early as possible Phone #: 2088616923 >> Inspection requested via mobile web by Fabian Noel,, upper retaining wall ok
|
BLD-Footing | 11/17/2018 | 11/19/2018 | 11/17/2018 | A | CANC |
Tony Young
|
|
|
As early as possible Phone #: 2088616923 >> Inspection requested via mobile web by Fabian Noel Inspection cancelled via mobile web on Saturday, November 17, 2018.
|