Permit Information
Permit NumberBLD18-03790
StatusFinaled
Name OGATA CONSTRUCTION
Site Address 812 E HEARTHSTONE DR
Project NameFeldhusen addition
Customer Number 
ePlanReviewNo
Description
WUI - HILLSIDE - Permit for a 258sq' 2nd level Living Room.addition. Scope includes rebuild of a portion of the deck. All work per plans, notations, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB** SUBGRADE REQUIRED PRIOR TO ALL FOOTING INSPECTIONS.
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/13/20199/13/20199/13/2019PPASS
DetailsTony Young
Bret Phone #: ###-####/// final ok
DOC - Permit Finaled9/13/20199/13/20199/13/2019PPASS
DetailsTony Young
BLD-Final9/11/20199/12/20199/12/2019PFAIL
DetailsBrandon Shaw
Smoke/ Carbon detectors all need to be interconnected and working...
Landing at Deck and Garage man door- floor not more than 7 3/4" below threshold...
BLD-Final9/10/20199/11/20199/11/2019ACANC
DetailsTony Young
per Cara cancel final will call later to reschedule

Please call Cara, 30 minutes prior to arrival.
Thank you! Phone #: ###-#### >> Inspection requested via web by Bret
BLD-Final8/29/20198/30/20198/30/2019ANR
DetailsTony Young
Kara Phone #: ###-####,, needs elec final 1st
BLD-Energy code compliance4/4/20194/5/20194/5/2019APASS
DetailsTony Young
Brett Phone #: ###-####
BLD-Framing/Rough-in4/2/20194/3/20194/3/2019APART
DetailsTony Young
Brett Phone #: ###-####,, see paint notes,, fire blocking, strap,, support,, seal,, etc,, ok to insulate,, deck portion not done yet
BLD-Footing11/19/201811/20/201811/20/2018APART
DetailsTony Young
Tim Phone #: ###-####,, work in progress
BLD-Footing11/15/201811/15/201811/15/2018PPART
DetailsTony Young
Colbi Phone #: ###-####,, ok after adding rebar per plan
BLD-Conference11/13/201811/14/201811/14/2018ANR
DetailsTony Young
Colbie ###-####
BLD-Footing11/13/201811/13/201811/13/2018PNR
DetailsTony Young
Colby Phone #: ###-####,, needs soils approval 1st